OSAO Construction Design Services Framework
Vocational classrooms where students learn. But the interior design waits for the team.
Discipline
Briefs where the interior is the project: fit-outs, refurbishments, furniture concepts and spatial upgrades of existing buildings.
Also in Claude, ChatGPT and Cursor Connect the MCP server
Grouped by what is being built, nearest deadline first. Days left are calculated for 28 Nov 2026.
Vocational classrooms where students learn. But the interior design waits for the team.
Ruovesi’s space programme turns user needs into measurable spatial requirements for a multi-functional school.
Ruovesi’s new comprehensive school: where a space programme turns user needs into measurable design criteria.
How do you design a permanent exhibition that turns a historic manor estate into a living story?
Eastern Art galleries: where conservation requirements become creative constraints.
Interior architects: how do you turn environmental criteria into a quiet framework for daily probation work?
Market consultation before scope: how interior architects shape the quiet framework for a future tender.
Renovating four social housing blocks: where asbestos removal becomes the first quiet rule of interior design.
A lakeside tourist landmark’s interior: where accommodation, gastronomy and a bathhouse meet daily use.
Interior designers: how do you redesign a municipal building in phases?
Exhibition logistics as the first spatial rule of every trade-fair stand.
Useful as a market signal: who commissions what, at which scale and through which procedure.