About the project

Preparation of complete building permit documentation and execution design for a new concert hall (auditorium) with necessary technical infrastructure at the Chopin Centre in Szafarnia. The project includes accessibility for people with disabilities and universal design requirements.

Scope of work

Preparation of complete building permit documentation (including obtaining final building permit decision) and execution design for a new concert hall (auditorium) with technical infrastructure. The project includes an option for author's supervision during construction, limited to 20% of the basic contract value and 24 months duration. The design must comply with accessibility standards for people with disabilities.

Deliverables

  • building permit documentation
  • execution design
  • final building permit decision
  • author's supervision (optional)

Required services

  • architectural design
  • structural engineering
  • sanitary installations design
  • electrical installations design
  • telecommunication installations design
  • acoustic design
  • cost estimation and monitoring
  • project supervision

Pelenoir assessment

The project primarily involves the design and documentation of a new concert hall, with architectural design as the dominant discipline. Engineering and technical planning (structural, MEP, acoustic) represent a significant secondary scope, while interior architecture and project management support the overall delivery. The classification is based on the explicit requirements for architectural, engineering, and supervision services.

  • Architectural concept, building design, and overall coordination of the new 200-seat concert hall, including compliance with accessibility and universal design requirements.

  • Structural, sanitary, electrical, and telecommunication installations design, as well as acoustic engineering for the concert hall.

  • Interior space planning, seating arrangement, and integration of interior elements to support the auditorium's functionality and acoustic performance.

  • Project supervision, cost estimation, and optional author's supervision during construction (limited to 20% of contract value and 24 months).

How to take part

Who can apply

  • insurance for professional liability (minimum 700,000 PLN)
  • experience in designing public buildings with auditoriums (minimum 200 seats)
  • experience in designing public buildings (minimum 1,000 m²)
  • qualified personnel: chief architect, structural engineer, sanitary/electrical/telecommunication engineers, acoustic specialist

What to submit

  • offer in Polish
  • electronic submission via e-Zamówienia platform
  • completed forms and attachments as per SWZ
  • insurance documents
  • personnel qualifications and experience documentation
  • previous project references

Award criteria

  • Price (60% weight)
  • Warranty and defect liability period (40% weight, minimum 36 months, maximum 60 months)

Tender documents

The visible document package includes three files: one PDF (SWZ_Szafarnia.pdf) and two ZIP archives. The PDF likely contains the full tender conditions, including contractual terms, eligibility criteria, and procedural requirements. The first ZIP archive (Załącznik nr 10 do SWZ_ opis przedmiotu zamówienia.zip) probably contains detailed project specifications, technical requirements, and possibly preliminary design guidelines for the concert hall. The second ZIP archive (Załączniki nr 1-9 do SWZ.zip) is expected to include submission forms, templates, and additional contractual annexes. The exact contents of the ZIP files remain uncertain without access, but their names suggest a structured breakdown of project documentation and administrative materials.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji dla projektu inwestycyjnego „Budowa audytorium przy Ośrodku Chopinowskim w Szafarni”.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.