Tenders of Europe project card: Prison service relocation: new fit-out for probation offices in Moulins, Moulins, France
Featured in the daily edition, 26 Nov 2026

About the project

Relocation and fit-out of the SPIP (Service pénitentiaire d'insertion et de probation) offices in Moulins, including design and construction oversight for the new premises.

Why it matters

A probation office fit-out brief turns environmental criteria into a quiet rulebook for daily institutional use. Where interior design meets operational rhythm.

The Moulins SPIP relocation brief specifies environmental criteria as a core requirement for the fit-out design.

This isn’t just a sustainability checkbox. It’s a quiet rulebook for daily probation work, forcing interior architects to integrate environmental constraints into institutional rhythms.

Scope of work

Full architectural and engineering design services (maîtrise d'œuvre) for the relocation and fit-out of probation offices, including site analysis, design development, construction documentation, and oversight of works.

Deliverables

  • Design studies and plans
  • Construction documentation
  • Oversight of works execution

Required services

Pelenoir assessment

The project involves the relocation and fit-out of probation offices, with a primary focus on architectural design and interior architecture. The scope explicitly includes architectural and engineering services for design development, construction documentation, and oversight of works, with a notable emphasis on interior fit-out and space planning.

  • Architectural design for the relocation and fit-out of the probation offices, including space planning, layout, and overall building design for the new premises.

  • Interior fit-out, space planning, and design of functional areas within the probation offices, including furniture integration and interior layout.

  • Engineering design for structural, civil, and building services required for the relocation and fit-out of the premises.

How to take part

Who can apply

  • Professional qualifications and experience as specified in the consultation regulations (règlement de consultation)
  • Technical, financial, and economic capacity requirements as per the consultation regulations

What to submit

  • Offers must comply with the consultation regulations (règlement de consultation)

Award criteria

  • Environmental criteria

Source

Published on BOAMP. Original title: Mission de maitrise d'oeuvre pour le relogement du SPIP de Moulins.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.