Architecture · Service contract
Prison service relocation: new fit-out for probation offices in Moulins
Interior architects: how do you turn environmental criteria into a quiet framework for daily probation work?
- Deadline
- 16 days left to apply
- Location
- Moulins, Auvergne-Rhône-Alpes, France
- Declared value
- EUR 1 m
About the project
Relocation and fit-out of the SPIP (Service pénitentiaire d'insertion et de probation) offices in Moulins, including design and construction oversight for the new premises.
Why it matters
A probation office fit-out brief turns environmental criteria into a quiet rulebook for daily institutional use. Where interior design meets operational rhythm.
The Moulins SPIP relocation brief specifies environmental criteria as a core requirement for the fit-out design.
This isn’t just a sustainability checkbox. It’s a quiet rulebook for daily probation work, forcing interior architects to integrate environmental constraints into institutional rhythms.
Scope of work
Full architectural and engineering design services (maîtrise d'œuvre) for the relocation and fit-out of probation offices, including site analysis, design development, construction documentation, and oversight of works.
Deliverables
- Design studies and plans
- Construction documentation
- Oversight of works execution
Required services
- Architectural design
- Engineering design
- Construction oversight
Pelenoir assessment
The project involves the relocation and fit-out of probation offices, with a primary focus on architectural design and interior architecture. The scope explicitly includes architectural and engineering services for design development, construction documentation, and oversight of works, with a notable emphasis on interior fit-out and space planning.
-
Architecture 60%
Architectural design for the relocation and fit-out of the probation offices, including space planning, layout, and overall building design for the new premises.
-
Interior fit-out, space planning, and design of functional areas within the probation offices, including furniture integration and interior layout.
-
Engineering 10%
Engineering design for structural, civil, and building services required for the relocation and fit-out of the premises.
How to take part
Who can apply
- Professional qualifications and experience as specified in the consultation regulations (règlement de consultation)
- Technical, financial, and economic capacity requirements as per the consultation regulations
What to submit
- Offers must comply with the consultation regulations (règlement de consultation)
Award criteria
- Environmental criteria
Source
Published on BOAMP. Original title: Mission de maitrise d'oeuvre pour le relogement du SPIP de Moulins.
Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


