Architecture · Service contract
University library conversion into central dean’s office
Complete design documentation for the adaptation of existing university library spaces into a central dean’s office, including architectural concept, full construction documentation, all required administrative approvals, and author’s supervision during…
- Deadline
- Closed 3 days ago
- Location
- Olsztyn, Warmińsko-Mazurskie, Poland
About the project
Complete design documentation for the adaptation of existing university library spaces into a central dean’s office, including architectural concept, full construction documentation, all required administrative approvals, and author’s supervision during construction.
Scope of work
Complete design services for converting existing university library spaces into a central dean’s office, including three stages: (1) architectural concept, (2) full construction documentation with all administrative approvals, and (3) author’s supervision during construction for at least 36 months or until building completion.
Deliverables
- Architectural concept (Stage I)
- Complete construction documentation with all required administrative approvals (Stage II)
- Author’s supervision during construction (Stage III)
Required services
- Architectural design
- Structural engineering
- Mechanical and electrical engineering
- Telecommunications design
- Author’s supervision
Pelenoir assessment
The project primarily involves architectural design for the conversion of existing university library spaces into a central dean’s office, including interior fit-out and engineering services. The scope covers architectural concept development, full construction documentation, and author’s supervision, with secondary focus on interior architecture and technical engineering to ensure functional adaptation of the space.
-
Architecture 60%
Architectural concept, building design, and full construction documentation for the conversion of existing university library spaces into a central dean’s office, including spatial planning and integration of functional requirements.
-
Interior fit-out, space planning, furniture integration, and interior design for the central dean’s office, ensuring functional and aesthetic adaptation of the existing library spaces.
-
Engineering 20%
Structural, mechanical, electrical, and telecommunications engineering for the conversion, including technical planning to ensure compliance with building regulations and functional requirements.
How to take part
Who can apply
- Minimum two completed design documentations for public buildings (minimum value 80,000 PLN gross each) within the last three years
- Project team must include licensed designers in architectural, structural, sanitary, electrical, and telecommunications specialties without limitations
What to submit
- Completed offer form (Załącznik nr 2 do SWZ)
- Statement on absence of exclusion grounds (Załącznik nr 3 do SWZ)
- Statement on meeting participation conditions (Załącznik nr 4 do SWZ)
- List of completed services with references (Załącznik nr 7 do SWZ)
- List of project team members with qualifications (Załącznik nr 8 do SWZ)
- Power of attorney for joint bidders (if applicable)
- Bid bond proof (2,500 PLN)
- RODO compliance statement (Załącznik nr 2 do SWZ)
Award criteria
- Price (100%)
Source
Published on e-Zamowienia. Original title: Wykonanie kompletnej dok. projektowej wraz z uzysk.wszelkich wym. uzgodnień, (...) zw. z adaptacją pom. Biblioteki Uniwersyteckiej na potrzeby Centralnego Dziekanatu.
Summary and assessment prepared by Pelenoir from the public notice (17 Nov 2026). The original notice and its documents are binding. Page updated 16 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.