Architecture · Design and build
UPWr classroom renovation and design for dropout management system
Design and construction of renovations for two university classrooms (Room 2.28H and Room 418M) to create accessible, divided spaces with mobile acoustic partitions, electrical and HVAC installations, and compliance with disability access standards.
- Deadline
- Closed 11 days ago
- Location
- Wrocław, Dolnośląskie, Poland
About the project
Design and construction of renovations for two university classrooms (Room 2.28H and Room 418M) to create accessible, divided spaces with mobile acoustic partitions, electrical and HVAC installations, and compliance with disability access standards. The project includes architectural and execution design, construction works, and as-built documentation.
Scope of work
Design-build contract for renovating two university classrooms (Room 2.28H and Room 418M) to create divided, accessible spaces with mobile acoustic partitions. Includes architectural and execution design, construction works (structural, electrical, HVAC, fire safety), and as-built documentation. Furniture and multimedia equipment are excluded but must be accommodated in designs.
Deliverables
- Harmonogram prac (work schedule)
- Project Budowlany (building permit design) for Room 418M
- Projekty Wykonawcze (execution designs) for both rooms
- Dokumentacja Powykonawcza (as-built documentation)
- Aneks do Instrukcji Bezpieczeństwa Pożarowego (fire safety instruction annex)
Required services
- architectural design (specialność architektoniczna)
- structural engineering design (specialność konstrukcyjno-budowlana)
- electrical installations design (instalacje elektryczne i elektroenergetyczne)
- telecommunications installations design (sieci, instalacje i urządzenia telekomunikacyjne)
- construction management (kierownik budowy)
- electrical works supervision (kierownik robót elektrycznych)
Pelenoir assessment
The project is a design-build renovation of two university classrooms, primarily focused on architectural and interior design to create accessible, divided spaces with mobile acoustic partitions. Engineering and technical planning for structural, electrical, HVAC, and fire safety systems is also a significant component of the scope. The project does not include landscape, urban planning, or construction contracting as primary disciplines.
-
Architecture 50%
Architectural design for the renovation of two university classrooms, including space division, accessibility adaptations, and integration of mobile acoustic partitions. Development of building permit and execution designs for compliance with Polish construction and accessibility standards.
-
Engineering 30%
Structural, electrical, HVAC, and fire safety engineering for the renovation of classrooms. Development of execution designs for installations and compliance with technical standards.
-
Interior space planning, fit-out design, and integration of mobile acoustic partitions to create divided, accessible classroom environments. Accommodation of furniture and multimedia equipment layouts in the design.
How to take part
Who can apply
- Minimum 2 completed construction projects (value ≥ PLN 125,000 each) in the last 5 years, covering structural, electrical, and HVAC works
- Project team must include licensed architects and engineers with 2–3 years of experience in relevant specialties
- Compliance with Polish construction law (Prawo budowlane) and accessibility standards (Ustawa o zapewnianiu dostępności)
What to submit
- Formularz ofertowy (offer form, Załącznik nr 1)
- Tabela ZZK (cost breakdown table, Załącznik nr 1A)
- Oświadczenie o niepodleganiu wykluczeniu (exclusion non-applicability statement, Załącznik nr 2)
- Oświadczenie o spełnieniu warunków udziału (eligibility statement, Załącznik nr 2A)
- Wykaz robót budowlanych (construction works list, Załącznik nr 5)
- Wykaz osób (project team list, Załącznik nr 5A)
- Electronic submission via Platforma Przetargowa (e-procurement platform)
Award criteria
- Cena (price) – 60% weight
- Okres gwarancji (warranty period) – 40% weight
Source
Published on e-Zamowienia. Original title: Wykonanie robót budowlanych wraz z dokumentacją projektową dotyczącą sal 2.28H oraz 418M w ramach zad.nr 5, projektu „System zarządzania drop-out na UPWr: monitorowanie i zapobieganie”.
Summary and assessment prepared by Pelenoir from the public notice (31 Oct 2026). The original notice and its documents are binding. Page updated 30 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
