About the project

Construction of a new laboratory building on the Polish Academy of Sciences (PAN) campus in Łódź using a design-build delivery method. The project includes architectural and engineering design, site preparation, structural works, building services installations, and finishing works for a multi-storey research facility.

Scope of work

The project requires the contractor to deliver full design documentation (building permit and execution designs, technical specifications, cost estimates) and execute all construction works for a new laboratory building. The facility must comply with universal design standards for accessibility, cybersecurity requirements for ICT systems, and environmental and social criteria. The contractor must employ key personnel with specified professional qualifications and experience in laboratory or healthcare building projects.

Deliverables

  • building permit design documentation
  • execution design documentation (architectural, structural, MEP, ICT)
  • technical specifications for construction works (STWiOR)
  • construction cost estimate
  • completed laboratory building with full building services installations
  • site preparation and earthworks
  • structural works (reinforced concrete, masonry)
  • thermal insulation and waterproofing
  • internal and external finishing works
  • mechanical, electrical, and plumbing installations (HVAC, water, sewage, electrical, gas, telecommunications)
  • building management system (BMS), access control, CCTV, fire alarm, and security systems

Required services

  • architectural design (full permit and execution documentation)
  • structural engineering design
  • MEP design (HVAC, water, sewage, electrical, gas, telecommunications)
  • ICT infrastructure design (cybersecurity-compliant)
  • construction management (site supervision, health and safety coordination)
  • site preparation and earthworks
  • structural works (reinforced concrete, masonry)
  • building envelope and finishing works
  • mechanical, electrical, and plumbing installations
  • commissioning and handover

Pelenoir assessment

The project is a design-build procurement for a new laboratory building, combining architectural and engineering design with construction execution. The primary focus is on architectural design (40%) and engineering/technical planning (35%), including structural, MEP, and ICT infrastructure design. Construction and general contracting (25%) covers the physical execution of the facility, supported by the design deliverables.

  • Architectural concept, building design, and full design documentation (building permit and execution designs) for the new laboratory building, including compliance with universal design standards and integration of building services.

  • Structural engineering, MEP (mechanical, electrical, plumbing) design, ICT infrastructure design (including cybersecurity compliance), and technical specifications for construction works (STWiOR).

  • Execution of all construction works, including site preparation, structural works, building envelope, finishing, and installation of building services (HVAC, electrical, plumbing, BMS, security systems).

How to take part

Who can apply

  • Contractor must demonstrate financial capacity (minimum 5,000,000 PLN in funds or credit)
  • Contractor must prove experience in designing and constructing public research or healthcare buildings (minimum 2 projects, each ≥1,000 m², ≥2 storeys) in the last 5 years
  • Contractor must employ key personnel with specified professional qualifications (architect, structural engineer, MEP engineers, construction managers) and experience in laboratory or healthcare building projects
  • Contractor must comply with Polish labour laws (employment of construction workers on employment contracts for specified works)
  • Contractor must submit a cybersecurity declaration and comply with Polish cybersecurity regulations for ICT systems
  • Contractor must comply with accessibility standards for persons with disabilities
  • Contractor must not use ICT products, services, or processes listed in Polish cybersecurity high-risk supplier regulations

What to submit

  • Completed offer form (załącznik nr 1 do SWZ)
  • Cybersecurity declaration (załącznik nr 2 do SWZ)
  • Confirmation of mandatory site visit (załącznik nr 12 do SWZ)
  • Uniform bidder statement (JOW, art. 125 ust. 1 uPzp, załącznik nr 3 do SWZ)
  • Bid bond documentation (if not in cash)
  • Power of attorney for representation (if applicable)
  • Bank or credit union statement confirming financial capacity (≤3 months old)
  • List of completed construction projects (załącznik nr 4 do SWZ) with references
  • List of key personnel assigned to the project with CVs and qualification documents
  • Certificates confirming no tax or social security arrears (≤3 months old)
  • Statement on compliance with cybersecurity requirements for ICT systems
  • Documents for consortium members or subcontractors (if applicable)

Award criteria

  • Price (60% weight)
  • Warranty period (40% weight)

Source

Published on e-Zamowienia. Original title: Budowa budynku laboratoryjnego na terenie należącym do PAN w formule zaprojektuj i wybuduj.