Architecture · Service contract
Indoor swimming pool: full design and cost documentation for new build
Preparation of multi-disciplinary design and cost documentation for a new indoor swimming pool, including all necessary administrative approvals and building permits.
- Deadline
- Closed 8 days ago
- Location
- Nowy Tomyśl, Wielkopolskie, Poland
About the project
Preparation of multi-disciplinary design and cost documentation for a new indoor swimming pool, including all necessary administrative approvals and building permits. The project covers architectural, structural, MEP, interior, landscaping and fire-safety designs, geotechnical surveys, and author supervision.
Scope of work
Full multi-disciplinary design and cost documentation for a new indoor swimming pool, including concept with functional programme and visualisations, geotechnical survey, architectural and site-development designs, technical/execution designs for all building services, fire-safety scenario, fire-safety instruction, tree inventory, green-protection and compensatory planting designs, and author supervision.
Deliverables
- concept with functional programme and visualisations
- geotechnical survey and opinion
- architectural and building design with site-development plan
- technical/execution design (structural, MEP, interior, landscaping)
- fire-safety scenario
- fire-safety instruction with equipment
- tree inventory (dendrological)
- green-protection design
- compensatory planting design
- Specifications for Execution and Acceptance of Works
- author supervision
Required services
- architectural design
- structural engineering
- MEP engineering (sanitary, electrical, telecom)
- landscape design
- geotechnical survey
- fire-safety design
- author supervision
Pelenoir assessment
The project involves the design and cost documentation for a new indoor swimming pool, covering multiple AEC disciplines. The primary focus is on architectural design, with significant contributions from engineering (structural and MEP), interior architecture, and landscape architecture. Additional specialist work includes geotechnical surveys and fire-safety design.
-
Architecture 40%
Architectural concept, building design, and overall coordination of the indoor swimming pool, including functional programme, visualisations, and integration of all technical disciplines.
-
Engineering 30%
Structural engineering, MEP (sanitary, electrical, telecom) engineering, and technical/execution designs for the swimming pool's building services and infrastructure.
-
Interior fit-out, space planning, and integration of interior elements specific to the swimming pool and associated facilities.
-
Landscape design, green-protection measures, compensatory planting, and outdoor environment planning for the swimming pool site.
-
Surveying 5%
Geotechnical survey and opinion to assess site conditions for the swimming pool's foundation and infrastructure.
-
Fire-safety design, including the fire-safety scenario and instruction, as well as author supervision during the project.
How to take part
Who can apply
- minimum two completed design documentations for public buildings ≥1,800 m² each, with construction value ≥ PLN 15 million gross
- at least one of these must be an indoor swimming pool with stainless-steel pools and ≥450 m² water surface
- qualified personnel: lead architect (unrestricted licence), structural engineer, MEP engineers (sanitary, electrical, telecom), road engineer (3+ years' experience)
- all proposed personnel must be fluent in Polish or have permanent translator support
What to submit
- completed offer form (attachment 2 to SWZ)
- declaration of meeting participation conditions (attachment 3a to SWZ)
- declaration of no exclusion grounds (attachment 3b to SWZ)
- list of completed services (attachment 6 to SWZ)
- list of personnel with qualifications and experience (attachment 7 to SWZ)
- power of attorney (if applicable)
- KRS/CEiDG excerpt (if required)
- bid bond confirmation
Award criteria
- Price (60%)
- Warranty and defect-liability period (40%)
Source
Published on e-Zamowienia. Original title: „Wykonanie dokumentacji projektowo-kosztorysowej na budowę krytego basenu w Nowym Tomyślu”.
Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.