Tenders of Europe project card: Interior design framework: sustainable and circular solutions for Oslo’s offices, schools and care centres, Oslo, Norway
Featured in the daily edition, 13 Nov 2026

About the project

Framework agreement for interior architecture services covering concept development, sustainability, acoustics, project management, 2D floor plans, 3D visualisation, workspace design, furnishing plans, and circular solutions such as reuse of existing furniture and inventory. The services will be applied across large and small projects in offices, schools, kindergartens, care institutions, museums and libraries with public areas in Oslo.

Why it matters

Oslo’s interior design framework turns circular solutions into the first quiet material constraint of every new office, school and care centre.

The framework agreement for interior architecture services in Oslo mandates circular solutions, including the reuse of existing furniture and inventory. This requirement turns material reuse into the first quiet constraint of every project. Long before the first 2D floor plan is drawn.

For interior architects, this circular-solution requirement means negotiating with the past before designing the future. Every new layout, acoustic solution and furnishing plan must work within the limits of what already exists, turning the brief into a quiet contract between the old and the new.

Scope of work

Framework agreement for interior architecture services including concept development, sustainability, acoustics, project management, 2D floor plans, 3D visualisation, workspace design, furnishing plans, and circular solutions such as reuse of existing furniture and inventory. The services are required for projects in offices, schools, kindergartens, care institutions, museums and libraries with public areas.

Deliverables

  • 2D floor plans
  • 3D visualisations
  • concept and idea development
  • sustainability and circular solutions assessments
  • acoustic solutions
  • project management
  • collage design
  • colour and material guidance
  • workspace design
  • furnishing plans

Required services

  • interior design
  • interior architecture
  • concept development
  • sustainability consulting
  • acoustic consulting
  • project management
  • circular economy solutions

Pelenoir assessment

This project is primarily an interior architecture framework for Oslo’s public interiors, covering offices, schools, kindergartens, care institutions, museums, and libraries. The scope focuses on interior design, concept development, floor plans, visualisation, and furnishing plans, with a secondary emphasis on sustainability and circular economy solutions.

  • Interior architecture services including concept development, 2D floor plans, 3D visualisation, workspace design, furnishing plans, colour and material guidance, and circular solutions for offices, schools, kindergartens, care institutions, museums, and libraries in Oslo.

  • Sustainability and circular economy assessments, including reuse of existing furniture and inventory, as well as acoustic solutions for interior environments.

How to take part

Who can apply

  • legally established company (firm certificate or equivalent registration proof required)
  • good economic and financial capacity (credit assessment and financial statements may be requested)
  • quality assurance system relevant to the contract (description or ISO 9001:2015 certification required)
  • experience from comparable projects in offices, schools, care institutions, and circular projects (minimum one reference per category required)
  • sufficient capacity to perform the contract (description of average yearly workforce and management staff required)

What to submit

  • tender submission via e-Tendering platform
  • documents in Norwegian
  • tender validity of 3 months
  • e-invoicing mandatory

Award criteria

  • Price (30%)
  • Quality (40%)
  • Circular economy and reuse (30%)

Source

Published on Doffin. Original title: Rammeavtale for interiørarkitekttjenster.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.