About the project

Vestland County Council, through Bybanen Utbygging, is procuring parallel framework agreements for multi-discipline design and engineering services covering all project phases for light rail, tunnels, bridges, roads, technical infrastructure, architecture, landscape, environment, health and safety, BIM and digital collaboration. The framework will also be available for call-offs by Bybanen AS and Eigedom og Utbygging.

Scope of work

Framework agreements for multi-discipline design, engineering, third-party control, independent building control, BIM and digital collaboration services across all project phases for light rail, tunnels, bridges, roads, technical infrastructure, architecture, landscape, environment and health and safety. The framework allows for direct call-offs and mini-competitions, with a maximum of five suppliers selected. Services may require partial or full on-site presence in Bergen, Norway.

Deliverables

  • design and engineering documentation
  • third-party control reports (NS standards)
  • independent building control reports (pbl. standards)
  • BIM models and digital collaboration outputs
  • resource coverage plans per discipline
  • methodology statements for project execution and risk reduction
  • pricing schedules for time-based fees per staff category

Required services

  • transport system design and engineering
  • architectural design
  • structural engineering
  • railway engineering
  • design services
  • third-party structural verification
  • landscape architecture
  • construction project management
  • technical inspection of structures
  • environmental management
  • health, safety and environment (HSE/SHA) services
  • BIM and digital collaboration

Pelenoir assessment

This framework agreement primarily supports multi-discipline design and engineering services for Norway’s expanding light rail network, covering infrastructure elements such as tunnels, bridges, roads, and technical systems. The project scope is dominated by engineering and technical planning, with secondary but significant contributions from architecture, landscape architecture, sustainability, BIM, and project management disciplines. The framework explicitly requires integrated delivery across all project phases, including third-party control, environmental management, and digital collaboration.

  • Structural, civil, railway, and technical engineering for light rail, tunnels, bridges, roads, and technical infrastructure, including third-party control and independent building control services.

  • Architectural design for light rail stations, associated buildings, and urban integration elements within the infrastructure network.

  • Landscape design for open spaces, parks, and outdoor environments associated with light rail corridors, stations, and infrastructure.

  • Environmental management, climate and sustainability integration, and health, safety, and environment (HSE/SHA) services across all project phases.

  • BIM modeling, digital collaboration, and information management for multi-discipline coordination and delivery of infrastructure projects.

  • Project management, construction supervision, and client representation for infrastructure projects, including resource planning and methodology development.

How to take part

Who can apply

  • open to suppliers from EEA countries
  • capacity to handle fluctuating workloads and rapid response times
  • sufficient resource availability per discipline for the entire agreement period
  • ability to work on-site in Bergen, Norway for specific call-offs

What to submit

  • completed pricing schedule document
  • resource coverage plan per discipline (document: Ressursdekning per fagområde)
  • methodology statement (max 4 pages, Arial 11, 1.15 line spacing, 2 cm margins) covering resource availability, response times and overcapacity benefits
  • project understanding and execution methodology statement (max 3 pages, Arial 11, 1.15 line spacing, 2 cm margins) covering risk reduction, climate and environmental integration

Award criteria

  • Price (35–45%): weighted evaluation of time-based fees per staff category
  • Delivery capacity and resource availability per discipline (20–30%): assessment of resource coverage, response times and overcapacity management
  • Task understanding and execution methodology (25–35%): evaluation of risk reduction, climate and environmental integration in methodology

Source

Published on Doffin. Original title: R06 Rammeavtale for prosjekteringstjenester.

Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.