About the project
Refurbishment and fit-out of a light industrial unit to temporarily relocate non-acute services from the University Hospital Galway (UHG) Campus, enabling renovation works on the main campus.
Why it matters
Refurbishing a light industrial unit for temporary healthcare requires adaptable design that meets functional needs without permanent infrastructure.
Scope of work
Appointment of a design team through a mini-competition under an existing Zone B enabling framework to provide architectural services for the renovation, refurbishment, and fit-out of a light industrial unit. The unit will serve as a temporary decant facility for non-acute services from the University Hospital Galway (UHG) Campus.
Deliverables
- Architectural design services for renovation and fit-out
- Urban planning services (if required)
Required services
- Architectural design
- Engineering and surveying services
- Planning and coordination
Pelenoir assessment
The project primarily involves architectural design for the renovation and refurbishment of a light industrial unit to serve as a temporary healthcare facility. This includes significant interior fit-out work to adapt the space for non-acute services, along with supporting engineering and technical planning for structural and building-services compliance.
-
Architecture 70%
Architectural design services for the renovation, refurbishment, and fit-out of the light industrial unit to accommodate non-acute healthcare services, including space planning, layout, and functional integration.
-
Interior fit-out, space planning, and design of functional areas within the industrial unit to support non-acute healthcare services, including furniture integration and interior detailing.
-
Engineering 10%
Structural, civil, and building-services engineering required for the renovation and refurbishment of the industrial unit, including compliance with healthcare facility standards.
How to take part
Who can apply
- Suppliers must be drawn from the existing Zone B enabling framework
- Experience in healthcare or industrial building refurbishment
Award criteria
- Most Economically Advantageous Tender (MEAT)
Source
Published on Irish eTenders. Original title: MiniComp for Architectural services Drawn from a Existing Zone B enabling Framework for “Renovation/Refurbishment and fit-out of a light industrial unit for the decant of non-acute from the UHG Campu.
Summary and assessment prepared by Pelenoir from the public notice (16 Oct 2026). The original notice and its documents are binding. Page updated 16 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
