About the project

Construction of a new domestic violence refuge facility at Dromore Drive Road, Mallow Town, Co. Cork, including full design team services from concept to completion.

Scope of work

Provision of an integrated design team for a new domestic violence refuge, covering architectural, structural, civil and building services engineering, quantity surveying, fire safety, disability access, project supervision, design certification, employer’s representation and BIM information management. Full service from Stage (i) to Stage (v) is required.

Deliverables

  • Integrated design team coordination
  • Architectural design
  • Structural and civil engineering design
  • Building services engineering design
  • Quantity surveying
  • Fire safety consultancy
  • Disability access consultancy
  • Project Supervisor Design Process (PSDP) services
  • Design and Assigned Certifier services
  • Employer’s Representative services
  • BIM Information Management

Required services

  • Design Team Lead
  • Architectural services
  • Structural engineering
  • Civil engineering
  • Building services engineering
  • Quantity surveying
  • Fire safety consultancy
  • Disability access consultancy
  • Project supervision (design process)
  • Design and assigned certification
  • Employer’s representation
  • BIM information management

Pelenoir assessment

The project is primarily an architectural design and integrated design team procurement for a new domestic violence refuge. The scope explicitly covers architectural design, engineering (structural, civil, and building services), project supervision, certification, and BIM information management, with architectural design as the dominant discipline.

  • Architectural design of the new domestic violence refuge, including concept development, space planning, building form, and compliance with functional and regulatory requirements.

  • Structural, civil, and building services engineering design, including infrastructure, technical systems, and compliance with engineering standards and regulations.

  • Project supervision during the design process (PSDP), employer’s representation, design certification, and coordination of the integrated design team from concept to completion.

  • BIM information management, digital coordination, and delivery of digital models for the design and construction phases.

How to take part

Award criteria

  • Most Economically Advantageous Tender (MEAT)

Source

Published on Irish eTenders. Original title: North Cork DVR - procurement of Design Team to deliver a New Domestic Violence Refuge at Dromore Drive Road, Mallow Town, Co. Cork..

Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.