Engineering · Service contract
Road redesign: two urban streets with full design documentation
Design and cost documentation for the reconstruction of two streets in Bieruń: Wrześniowa and Za Kopcem, including conceptual design, multi-discipline project documentation, obtaining necessary permits, and optional author's supervision during construction.
- Deadline
- 9 days left to apply
- Location
- Bieruń, Śląskie, Poland
About the project
Design and cost documentation for the reconstruction of two streets in Bieruń: Wrześniowa and Za Kopcem, including conceptual design, multi-discipline project documentation, obtaining necessary permits, and optional author's supervision during construction.
Scope of work
Preparation of comprehensive design and cost documentation for the reconstruction of two streets (Wrześniowa and Za Kopcem) with a total length of approximately 977–1018 metres, including conceptual design (two variants), multi-discipline project documentation, obtaining necessary permits (e.g., construction permit or road investment approval), and optional author's supervision during construction (up to 10% of the basic contract value).
Deliverables
- Conceptual design of road geometry (two variants)
- Multi-discipline design and cost documentation for road reconstruction
- Necessary materials and data for design
- Opinions, agreements, consents, technical and implementation conditions, decisions, approvals, and other legally required documents
- Final decision on road investment approval and/or construction permit
- Optional: Author's supervision during construction (up to 10% of the basic contract value)
Required services
- Civil engineering design services
- Project preparation and cost estimation
- Preparation of approval plans, working drawings, and specifications
- Project and documentation supervision
- Author's supervision (optional)
Pelenoir assessment
This project primarily involves civil engineering and technical planning for the reconstruction of two urban streets, including design documentation, permits, and infrastructure planning. A secondary component includes project management and supervision tasks related to documentation and optional construction oversight.
-
Engineering 80%
Civil engineering design for the reconstruction of two urban streets, including road geometry, infrastructure planning, technical documentation, and obtaining necessary permits such as construction permits or road investment approvals.
-
Supervision of project documentation preparation, coordination of approvals, and optional author's supervision during the construction phase.
How to take part
Who can apply
- Contractor must have at least one person with at least 3 years of unlimited road engineering design qualifications and experience in preparing design documentation for roads of at least category D (minimum 1000 metres) with a final construction permit or road investment approval decision within the last three years
- For joint bidders, at least one contractor must meet the full eligibility requirements
What to submit
- Offers and documents must be submitted electronically via the designated platform
- Documents must be prepared in Polish
- Required documents include: statement on exclusion grounds, KRS or CEIDG excerpt (or equivalent for foreign contractors), list of personnel assigned to the project with qualifications and experience, and declarations for joint bidders
Award criteria
- Price (60% weight)
- Execution deadline for documentation corrections (40% weight)
Source
Published on e-Zamowienia. Original title: Dokumentacja projektowa ulic: Wrześniowej i Za Kopcem.
Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.