Engineering · Service contract
Street design: new Słoneczna Street construction in Malinowice
Preparation of full design documentation for the construction of Słoneczna Street in Malinowice, including obtaining all necessary permits, approvals and construction permits or notifications, and providing author supervision during construction.
- Deadline
- 3 days left to apply
- Location
- Psary, Śląskie, Poland
About the project
Preparation of full design documentation for the construction of Słoneczna Street in Malinowice, including obtaining all necessary permits, approvals and construction permits or notifications, and providing author supervision during construction. The project must ensure accessibility for people with disabilities by eliminating architectural barriers.
Scope of work
Preparation of full design documentation (construction design and/or construction-execution design) for the new Słoneczna Street in Malinowice, including obtaining all necessary permits, approvals and construction permits or notifications, and providing author supervision during construction. The design must comply with accessibility requirements for people with disabilities.
Deliverables
- construction design documentation
- construction-execution design documentation
- author supervision during construction
- obtaining all necessary permits, approvals and construction permits or notifications
Required services
- engineering design services (road speciality)
- project and documentation supervision
- construction supervision
Pelenoir assessment
This project primarily involves the engineering and technical planning required for the design and documentation of a new street construction, including road engineering and accessibility compliance. A secondary aspect involves project and construction management, specifically author supervision during the construction phase and the coordination of permits.
-
Engineering 80%
Preparation of full construction and construction-execution design documentation for the new Słoneczna Street, including road engineering, technical specifications, and compliance with accessibility requirements for people with disabilities.
-
Author supervision during the construction phase, ensuring compliance with the design documentation and obtaining all necessary permits, approvals, and construction permits or notifications.
How to take part
Who can apply
- Contractor must demonstrate experience in preparing at least one complete design documentation for a road construction, expansion or reconstruction project that obtained a construction permit, no objection to construction notification, or road investment implementation permit (ZRID) within the last 3 years
- Contractor must have or will have a designer with full road engineering design qualifications (unlimited design rights in road engineering speciality) and registered in the relevant professional association
- Contractor must have or will have a checking designer with full road engineering design qualifications (unlimited design rights in road engineering speciality) and registered in the relevant professional association
- For consortia, one member must individually meet the experience requirement; experience is not cumulative
What to submit
- Offer in electronic form via the procurement platform
- Statement on non-exclusion and meeting participation conditions (Annex 2 to SWZ)
- Statement confirming familiarity with tender conditions and draft contract (Annex 1 to SWZ)
- Power of attorney for representation (if applicable)
- Statement on division of works among consortium members (if applicable)
- Commitment from resource-sharing entities (if applicable, Annex 4 to SWZ)
Award criteria
- Offer price (60% weight)
- Experience of the designated designer with full road engineering design qualifications (20% weight)
- Experience of the designated checking designer with full road engineering design qualifications (20% weight)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej w ramach zadania pn. „Budowa ul. Słonecznej w Malinowicach”..
Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.