About the project

Preparation of comprehensive design and cost documentation for the construction of approximately 350 meters of road connecting Zakrzewska and Stefanowska Streets in Golina, including access to a school area. The project includes site inspection, conceptual design, obtaining necessary permits, construction documentation (site development, architectural, technical), execution project (if required), bills of quantities, cost estimates, technical specifications, and potential author supervision during construction.

Scope of work

Comprehensive preparation of design and cost documentation for a new road section (approx. 350 meters) including site inspection, conceptual design, construction documentation (site development, architectural, technical), obtaining permits (including ZRID decision), bills of quantities, cost estimates, technical specifications, and potential author supervision during construction. The documentation must enable a subsequent public procurement for construction works.

Deliverables

  • site inspection report
  • agreed conceptual design
  • construction documentation (site development plan, architectural and construction design, technical design including road, sanitary, electrical branches)
  • required permits, approvals, and decisions (including ZRID decision)
  • execution project (if required)
  • bills of quantities for each branch
  • investor and offer cost estimates for each branch
  • technical specifications for execution and acceptance of construction works (STWIORB)
  • transfer of copyrights to the documentation

Required services

  • civil engineering design (road infrastructure)
  • cost estimation and budgeting
  • technical documentation preparation
  • project supervision (optional author supervision)
  • obtaining permits and approvals

Pelenoir assessment

This project primarily involves the preparation of design and cost documentation for a municipal road infrastructure development, with a strong focus on civil engineering and technical planning. The scope also includes project management tasks such as cost estimation, technical specifications, and optional supervision, but these are secondary to the core engineering requirements.

  • Civil engineering design for the road infrastructure, including structural, technical, and infrastructure planning for the 350-meter road section, sanitary and electrical branches, and obtaining the ZRID decision (road investment permit).

  • Cost estimation, budgeting, technical specifications for execution and acceptance (STWIORB), and optional author supervision during construction to ensure compliance with design and regulatory requirements.

How to take part

Who can apply

  • experience in designing roads of at least 200 meters with obtained ZRID decision in the last 3 years
  • at least one person with unlimited road engineering design qualifications (or equivalent EU-recognized qualifications)

What to submit

  • offer form (ZAŁĄCZNIK NR 1)
  • statements and declarations (ZAŁĄCZNIK NR 2, 5, 6, 9, 10)
  • undertaking of third-party obligations (ZAŁĄCZNIK NR 4)
  • list of services performed (ZAŁĄCZNIK NR 7)
  • list of persons assigned to the project (ZAŁĄCZNIK NR 8)
  • equivalent solutions statement (if applicable)
  • confidentiality statement (if applicable)
  • power of attorney (if applicable)

Award criteria

  • Price (60%)
  • Quality guarantee and warranty (40%)

Tender documents

The visible document package includes 11 files: 9 DOCX documents and 2 ZIP archives. The DOCX files likely contain submission forms (e.g., offer form, declarations), statements (e.g., consortium agreements, confidentiality, third-party obligations), and lists (e.g., services performed, assigned personnel). The ZIP archives are labeled as 'PROJEKT UMOWY' (contract draft) and 'OPIS PRZEDMIOTU ZAMÓWIENIA' (project description), suggesting they contain detailed contractual terms and technical specifications or drawings for the road construction project. The exact contents of the ZIP files cannot be confirmed without access, but their titles indicate they are central to the tender's scope and legal framework. The package appears to cover all necessary documentation for submission, evaluation, and contract execution.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo-kosztorysowej dla budowy drogi między ul. Zakrzewską i ul. Stefanowską w Golinie z dojazdem do terenu szkoły.