About the project

Preparation of complete design documentation for the reconstruction of two reinforced concrete drinking water tanks in Sopot and Gdynia, including structural, technological, electrical, control, monitoring and telemetry systems to meet current technical and operational requirements.

Scope of work

Complete design documentation for the reconstruction of two drinking water tanks, including structural redesign, technological, electrical, control, monitoring and telemetry systems to restore or increase operational capacity and meet current technical standards.

Deliverables

  • complete design documentation for reconstruction of two drinking water tanks
  • structural redesign of reinforced concrete tanks
  • technological, electrical, control, monitoring and telemetry system designs

Required services

Pelenoir assessment

This project primarily involves engineering and technical planning for the reconstruction of two drinking water tanks, focusing on structural, technological, and system redesign. Architectural design services are also required but represent a smaller share of the scope, likely addressing the external and functional integration of the tanks.

  • Structural redesign of reinforced concrete drinking water tanks, including technological, electrical, control, monitoring, and telemetry systems to ensure compliance with current technical and operational standards.

  • Architectural design services for the external and functional aspects of the drinking water tanks, ensuring integration with the surrounding environment and compliance with building regulations.

How to take part

Who can apply

  • Contractor must provide at least one designer with unlimited construction design licence in structural engineering who has completed at least one project for a reinforced concrete drinking water tank (≥2000 m³) and a pressure boosting station (≥100 m³/h).
  • Contractor must provide at least one designer with unlimited construction design licence in sanitary engineering who has completed at least one project for a reinforced concrete drinking water tank (≥2000 m³) and a pressure boosting station (≥100 m³/h).
  • Designers must be members of the relevant professional chamber and hold valid construction licences under Polish law or equivalent EU-recognised qualifications.

What to submit

  • Offer in Polish, in electronic form with qualified electronic signature, trusted signature or personal signature.
  • Statement under art. 125 ust. 1 of the Public Procurement Law (oświadczenie o braku podstaw wykluczenia).
  • Document confirming the authority of the person acting on behalf of the contractor (e.g., excerpt from the National Court Register, Central Register of Economic Activity or other relevant register).
  • Power of attorney if the authority is not derived from the register excerpt.
  • For consortia: power of attorney appointing a common representative and a statement detailing the division of services among consortium members.
  • If relying on third-party resources: commitment from the third party to provide the necessary resources and a statement confirming the third party’s eligibility.

Award criteria

  • Price (60% weight)
  • Guarantee (40% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla przebudowy dwóch zbiorników wody pitnej.

Summary and assessment prepared by Pelenoir from the public notice (18 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.