About the project

Preparation of full design documentation for the reconstruction of two county roads in Pomerania: road 1174G (5.2 km, including one bridge) and road 1165G (5.1 km, including a cycle path). The project covers survey maps, conceptual and construction designs, environmental assessments, geotechnical documentation, cost estimates, and obtaining the ZRID decision (land development conditions).

Scope of work

Preparation of complete design documentation for two county road reconstruction projects, including survey maps, conceptual and construction designs, environmental assessments, geotechnical documentation, cost estimates, and obtaining the ZRID decision (land development conditions). Task 1 includes a bridge; Task 2 includes a cycle path.

Deliverables

  • Survey maps for design purposes
  • Conceptual design
  • Construction design (projekt budowlany)
  • Environmental assessments
  • Geotechnical documentation
  • ZRID decision application documentation (including land division projects)
  • Technical specifications (STWIORB)
  • Quantity surveys (przedmiary)
  • Cost estimates (kosztorysy ofertowe and inwestorskie)
  • Land division marking and boundary posts (PD)
  • Updates to land and building records

Required services

  • Civil engineering design (road and bridge)
  • Surveying and mapping
  • Environmental impact assessment
  • Geotechnical engineering
  • Cost estimation

Pelenoir assessment

This project is primarily a civil and technical engineering assignment for the redesign of two county roads, including a bridge and a cycle path. Secondary scope includes surveying for design mapping and land records, as well as specialist consulting for environmental and geotechnical documentation.

  • Civil engineering design for road reconstruction, bridge design (Task 1), and cycle path integration (Task 2), including structural, drainage, and technical infrastructure planning.

  • Surveying 15%

    Preparation of survey maps for design purposes, land division marking, and updates to land and building records.

  • Environmental impact assessments, geotechnical documentation, and obtaining the ZRID decision (land development conditions).

How to take part

Who can apply

  • At least one designer with unlimited road engineering qualifications (3+ years experience)
  • At least one designer with unlimited installation engineering qualifications (3+ years experience) for thermal, ventilation, gas, water, and sewage systems
  • At least one designer with unlimited bridge engineering qualifications (3+ years experience) for Task 1
  • Compliance with Polish construction law (Prawo budowlane) or equivalent EU-recognized qualifications

What to submit

  • Completed offer form (zał. nr 1)
  • Cost estimates for each task (zał. nr 1A and 1B)
  • Statement on exclusion grounds and eligibility (zał. nr 2)
  • Commitment from third parties (if applicable, zał. nr 3)
  • List of personnel for each task (zał. nr 5)
  • Consortium agreement (if applicable, zał. nr 3A)
  • Bid bond (wadium) confirmation

Award criteria

  • Price (60% weight)
  • Road engineering designer experience (20% weight for Task 1, 30% for Task 2)
  • Installation engineering designer experience (10% weight for both tasks)
  • Bridge engineering designer experience (10% weight for Task 1)

Tender documents

The visible files include the full tender documentation package for this road redesign project. The ODT files likely contain the Specyfikacja Warunków Zamówienia (SWZ), offer forms, statements of eligibility, third-party commitments, detailed project descriptions, personnel lists, and draft contracts for both tasks. The ODS files are cost estimate templates for each road segment. The PDFs include the official tender notice and two maps showing the geographic scope of each road segment (Borzęcino-DW210 for Task 1 and Kępice-Biesowice for Task 2). The exact content of the technical drawings, environmental assessments, or geotechnical reports is not visible from the filenames alone.

Source

Published on e-Zamowienia. Original title: „Opracowanie dokumentacji projektowych na przebudowę dróg powiatowych: 1174G i 1165G” w podziale na 2 zadania.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.