About the project

Preparation of complete multi-discipline design documentation for the construction of two cycle paths (routes 222 and 224) in Bełchatów, including lighting, CCTV, associated infrastructure, geotechnical surveys, environmental approvals, traffic organisation projects, and obtaining all required permits and decisions.

Scope of work

Preparation of complete multi-discipline design documentation for two new cycle paths (routes 222 and 224) in Bełchatów, including construction design, execution design, bills of quantities, technical specifications, cost estimates, visualisations, ecological balance, geotechnical surveys, environmental approvals, traffic organisation projects, and obtaining all required permits and decisions.

Deliverables

  • construction design (5 copies)
  • execution design (5 copies)
  • bills of quantities (3 copies)
  • technical specifications for execution and acceptance of construction works (STWiORB, 3 copies)
  • cost estimates (3 copies)
  • visualisations (minimum 6)
  • ecological balance report
  • geotechnical survey documentation
  • environmental impact documentation and decisions
  • water law permits and documentation
  • building permit or notification decision
  • traffic organisation projects
  • digital and paper documentation in specified formats (PDF, DOC/ODT, DWG/DXF, XLS/ODS, ATH)

Required services

  • engineering design (civil and water engineering)
  • architectural and construction design
  • electrical system design (lighting and power supply)
  • telecommunications design (CCTV)
  • water and sewage system design
  • geotechnical surveys
  • cost estimation
  • environmental impact assessment
  • traffic organisation design
  • obtaining permits and approvals

Pelenoir assessment

The project primarily involves the multi-discipline engineering design of two urban cycle paths, including technical systems (lighting, CCTV, drainage) and infrastructure integration. Secondary disciplines include urban planning for traffic organisation, landscape design for environmental and ecological balance, and sustainability assessments for permits and compliance.

  • Design of civil and water engineering elements for the cycle paths, including structural integrity, drainage, lighting, CCTV infrastructure, and technical coordination of multi-discipline systems.

  • Integration of the cycle paths into the urban fabric, traffic organisation projects, public space planning, and coordination with existing infrastructure.

  • Design of associated outdoor infrastructure, planting, ecological balance, and integration of the cycle paths with the surrounding environment.

  • Environmental impact assessments, water law permits, and sustainability considerations for the cycle path infrastructure.

How to take part

Who can apply

  • minimum 3 years of experience in designing cycle paths or similar infrastructure (minimum 2 km, multi-discipline, minimum value 250,000 PLN)
  • minimum 3 years of experience in designing pedestrian/cycle bridges over watercourses
  • design team with valid professional licences in: road engineering, structural engineering, electrical engineering, telecommunications engineering, water and sewage engineering
  • civil liability insurance (minimum 450,000 PLN)

What to submit

  • completed offer form
  • statement on meeting participation conditions and absence of exclusion grounds (art. 125 ust. 1 ustawy PZP)
  • documents confirming professional licences and chamber membership for designers
  • references for similar completed projects
  • insurance certificate (civil liability, minimum 450,000 PLN)
  • declaration on resource sharing (if applicable)
  • power of attorney (for consortia)
  • company registration documents

Award criteria

  • Price (60% weight)
  • Length of warranty and guarantee period (40% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie kompletnej, wielobranżowej dokumentacji projektowej budowy tras rowerowych nr 222 i nr 224 na terenie miasta Bełchatów wraz z oświetleniem, monitoringiem i infrastrukturą towarzyszącą.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.