About the project

Design documentation for the construction of pedestrian paths along five segments of regional road No. 887, including bus bays in two locations. The project covers approximately 6.5 km of new pedestrian infrastructure.

Scope of work

Preparation of design documentation for five segments of pedestrian paths along regional road No. 887, including technical conditions issued by the Podkarpacki Regional Road Authority. The documentation must comply with the requirements specified in the SWZ (Specification of Contract Conditions) and its annexes.

Deliverables

  • Design documentation for pedestrian paths (five segments)
  • Technical documentation compliant with regional road authority conditions
  • Documentation for bus bays (two locations)

Required services

  • Civil engineering design services
  • Road design services
  • Pedestrian infrastructure design

Pelenoir assessment

This project primarily involves the engineering and technical planning of pedestrian paths and bus bays along a regional road, with a secondary focus on urban design and spatial integration. The scope is dominated by civil and road engineering design, while urban design ensures the infrastructure aligns with broader transport and accessibility requirements.

  • Civil and road engineering design for pedestrian paths, including geometric layout, pavement design, drainage, signage, and compliance with regional road authority technical conditions.

  • Integration of pedestrian paths and bus bays into the existing urban and transport network, including spatial planning, accessibility, and coordination with regional road infrastructure.

How to take part

Who can apply

  • Demonstration of at least one person with road design qualifications for at least 5 years
  • Compliance with Polish Public Procurement Law (art. 108, 109)
  • No grounds for exclusion under facultative bases (e.g., bankruptcy, professional misconduct, prior contract breaches)

What to submit

  • Offers must be submitted electronically via the e-Zamówienia Platform
  • Documents must be prepared in Polish
  • Submission of a power of attorney for consortia
  • Compliance with SWZ requirements and annexes

Award criteria

  • Price (100% weight)

Tender documents

The visible ZIP file is titled 'SWZ RIN.271.1.17.2026 OprChdn1.zip' and likely contains the Specification of Contract Conditions (SWZ) along with its annexes. This package probably includes detailed technical requirements for the pedestrian path design, contractual terms, submission forms, and possibly preliminary drawings or site plans. The annexes may also cover eligibility criteria, evaluation methods, and templates for required documentation. However, the exact contents of the ZIP file cannot be confirmed without access, and no specific file names or internal structure beyond the ZIP archive are visible.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej budowy dróg dla pieszych w ciągu drogi wojewódzkiej Nr 887 Brzozów - Rymanów - Daliowa.

Summary and assessment prepared by Pelenoir from the public notice (24 Nov 2026). The original notice and its documents are binding. Page updated 23 Nov 2026.