About the project

Comprehensive design documentation for the second stage of the Mieścisko bypass, including a 2.67 km municipal road, a 26.5 m span bridge over the Wełna river, road lighting, stormwater drainage, and a technology channel. The project aims to improve traffic flow and road safety in Mieścisko.

Scope of work

The contractor is required to prepare comprehensive design documentation for the second stage of the Mieścisko bypass, including obtaining the ZRID decision (building permit). The scope covers a 2.67 km municipal road, a 26.5 m span bridge, road lighting, stormwater drainage, and a technology channel.

Deliverables

  • Design documentation for a 2.67 km municipal road
  • Design documentation for a 26.5 m span bridge
  • Road lighting design
  • Stormwater drainage design
  • Technology channel design
  • ZRID decision (building permit)

Required services

Pelenoir assessment

This project is primarily focused on engineering and technical planning for transport infrastructure, including the design of a municipal road, bridge, drainage, and lighting systems. A secondary aspect involves project management tasks, such as obtaining the building permit and coordinating compliance with procurement requirements.

  • Design of the 2.67 km municipal road, 26.5 m span bridge over the Wełna river, stormwater drainage, road lighting, and technology channel, including technical engineering and infrastructure planning.

  • Coordination of the design process, including obtaining the ZRID decision (building permit) and ensuring compliance with the SWZ (Specification of Essential Terms).

How to take part

Who can apply

  • Contractor must demonstrate experience in designing at least two road projects (minimum class Z, 3 km length) under Poland's public roads act in the last 5 years
  • Contractor must demonstrate experience in designing at least two engineering structures (minimum 25 m theoretical span) in the last 5 years
  • Contractor must employ a road design specialist with unlimited design qualifications
  • Contractor must employ a bridge design specialist with unlimited design qualifications

What to submit

  • Offers must be submitted electronically via the designated procurement platform
  • Documents must comply with the technical and organisational requirements specified in the SWZ (Specification of Essential Terms)

Award criteria

  • Price (60% weight)
  • Warranty (40% weight, labelled 'rękojmia')

Source

Published on e-Zamowienia. Original title: Budowa Obwodnicy Mieściska II etap- dokumentacja.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.