Engineering · Service contract
Road expansion design: 720-metre provincial road upgrade
Preparation of full design documentation for the expansion of provincial road no.
- Deadline
- 6 days left to apply
- Location
- Ruzieck, Mazowieckie, Poland
About the project
Preparation of full design documentation for the expansion of provincial road no. 544 between kilometre posts 142+280 and 143+000 in Ruzieck, Krasnosielc municipality. The scope includes geotechnical and geological documentation, environmental impact assessments, construction and demolition designs, property division maps, traffic organisation plans, and execution blueprints with technical specifications and cost estimates.
Scope of work
Full design documentation for a 720-metre provincial road expansion, including geotechnical studies, environmental impact assessments, construction and demolition designs, property division maps, traffic organisation plans, execution blueprints, technical specifications, and cost estimates. The contractor must maintain professional liability insurance of at least PLN 200,000.
Deliverables
- Geotechnical and geological documentation
- Environmental impact assessment attachments
- Environmental impact report
- Documents for re-assessment of environmental impact
- Construction design (PZT + PAB + PT)
- Demolition design
- Property division maps
- Attachments for road investment permit application
- Water law permit attachments
- Permanent traffic organisation and traffic light design
- Execution blueprints
- Technical specifications
- Investment cost estimate
Required services
- Architectural and engineering design
- Geotechnical and geological surveys
- Environmental impact assessment
- Traffic organisation planning
- Cost estimation
Pelenoir assessment
This project is primarily focused on engineering and technical planning for a provincial road expansion, including structural, civil, and infrastructure design. Secondary aspects involve urban design and planning for traffic organisation and spatial integration, as well as sustainability and building performance for environmental impact assessments.
-
Engineering 70%
Design and technical planning for the 720-metre provincial road expansion, including structural, civil, and infrastructure engineering for road construction, geotechnical surveys, traffic organisation, and technical specifications.
-
Traffic organisation planning, integration of the road expansion into the existing urban and spatial context, and coordination with environmental and property division requirements.
-
Sustainability 15%
Environmental impact assessments, including reports and attachments for re-assessment, as well as compliance with environmental regulations for the road expansion.
How to take part
Who can apply
- At least two completed design services for road expansions or constructions (minimum class G, 0.5 km each) within the last five years
- One designer with road engineering qualifications (Polish construction law)
- One verifying designer with road engineering qualifications (Polish construction law)
- Designers must demonstrate experience in at least two road expansion or construction projects (minimum class G, 0.5 km each)
- Professional liability insurance of at least PLN 200,000 for the contract duration
What to submit
- Electronic offer in formats: .pdf, .doc, .docx, .xls, .xlsx, .jpg (.jpeg)
- Electronic offer must be signed with a trusted or personal signature
- Submission via the electronic procurement platform (platformazakupowa.pl)
- Documents in Polish
- Evidence of completed similar projects (references or statements)
- List of personnel with qualifications and experience
- Insurance policy confirmation (within 7 days of contract signing)
Award criteria
- Price (60% weight)
- Warranty period (40% weight)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej dla rozbudowy drogi wojewódzkiej nr 544 na odcinku od km 142+280 do km 143+000 na terenie m. Ruzieck, gm. Krasnosielc, pow. makowski – nr postępowania 231/26.
Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
