About the project

Preparation of complete and ready-to-implement design documentation for the construction of a water supply network in Górki, including potential construction of water storage tanks, enabling subsequent procurement for construction works.

Scope of work

Preparation of complete design documentation for a water supply network in Górki, including potential construction of steel water storage tanks (balancing/retention) with a minimum total active capacity of 500 m³, equipped with dedicated valve chambers and automated water parameter monitoring and control systems. The documentation must enable subsequent procurement for construction works.

Deliverables

  • Complete design documentation for water supply network
  • Design documentation for potential steel water storage tanks (balancing/retention) with minimum 500 m³ capacity
  • Design documentation for advanced pressure boosting stations/pumping stations with minimum 50 m³/h nominal capacity
  • Documentation enabling procurement for construction works (e.g., building permit or effective construction notification)

Required services

  • Engineering design services for water supply infrastructure
  • Preparation of construction-ready documentation

Pelenoir assessment

This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING as its scope is focused on the design and technical planning of water supply infrastructure, including storage tanks and pumping stations. No other AEC business groups are supported by the extracted facts, as the project does not involve architectural design, urban planning, landscape, interior design, or other disciplines.

  • Design of water supply network infrastructure, including steel water storage tanks, pressure boosting stations, valve chambers, and automated monitoring and control systems. Preparation of technical documentation enabling construction procurement.

How to take part

Who can apply

  • Contractor must demonstrate experience in designing water supply or gas networks with a minimum total length of 15 km in the last 3 years
  • Contractor must employ a chief sanitary designer with at least 3 years of professional experience and relevant building permits
  • Contractor must employ an electrical designer with at least 3 years of professional experience and relevant building permits
  • Contractor must provide evidence of at least two comparable design documentation projects completed in the last 3 years

What to submit

  • Completed offer form (Załącznik nr 1)
  • Signed statements as per Art. 125(1) and Art. 117(4) of the Polish Public Procurement Law
  • List of services performed (Załącznik nr 6)
  • List of personnel assigned to the project (Załącznik nr 7)
  • Commitment of resource-sharing entities (if applicable, Załącznik nr 5)
  • Data processing agreement (Załącznik nr 8)
  • Documents confirming authorization to represent the contractor

Award criteria

  • Price (60% weight)
  • Experience of personnel assigned to the project (10% weight)
  • Project completion timeline (30% weight)

Tender documents

The visible document package includes 11 files: 8 DOCX files containing submission forms, declarations, service lists, and personnel lists; 2 PDF files with the specification of contract conditions and a sample contract; and 1 ZIP file labeled as 'Opis przedmiotu zamówienia' (Description of the subject of the order). The ZIP file likely contains detailed technical descriptions, design requirements, and possibly preliminary drawings or technical specifications for the water supply network and associated infrastructure. The PDF and DOCX files appear to cover administrative, legal, and procedural requirements for submitting a valid offer. The exact contents of the ZIP file remain uncertain without further access, but its title suggests it holds core project documentation.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej sieci wodociągowej w miejscowości Górki.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 29 Sep 2026.