Engineering · Study
Waste2Emissions CO₂ capture and conditioning feasibility study
Technical feasibility study and pre-dimensioning (Pre-FEED) for a complete carbon dioxide (CO₂) capture, purification, compression, and conditioning unit at Ipalle's energy recovery center in Thumaide.
- Deadline
- 2 days left to apply
- Location
- Thumaide, Hainaut, Belgium
About the project
Technical feasibility study and pre-dimensioning (Pre-FEED) for a complete carbon dioxide (CO₂) capture, purification, compression, and conditioning unit at Ipalle's energy recovery center in Thumaide.
Scope of work
Technical feasibility study and pre-dimensioning (Pre-FEED) for a CO₂ capture, purification, compression, and conditioning unit at Ipalle's energy recovery center. The study aims to assess the technical viability and preliminary engineering design for the installation.
Deliverables
- Technical feasibility study report
- Pre-FEED (pre-dimensioning) documentation
Required services
- engineering consultancy
- feasibility assessment
- preliminary design (Pre-FEED)
Pelenoir assessment
This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING due to its focus on a technical feasibility study and pre-dimensioning (Pre-FEED) for an industrial CO₂ capture and conditioning unit. The scope is purely engineering-driven, with no evidence of architectural, urban, landscape, or interior design work.
-
Engineering 100%
Technical feasibility assessment, pre-dimensioning (Pre-FEED), and preliminary engineering design for a CO₂ capture, purification, compression, and conditioning unit at an industrial waste management facility.
How to take part
Who can apply
- Compliance with exclusion grounds as per procurement documents
- Selection criteria as defined in the tender documents
What to submit
- Submission via electronic platform (e-submission required)
- Signed submission report (electronic signature mandatory)
Award criteria
- Cost (50 points)
- Technical quality of the offer (40 points)
- Completion timeline (10 points)
Tender documents
The visible document package includes a contract specification file in DOCX and PDF formats (CSC_IPALLE_THU_SST_2026_WP4_002), likely containing the main tender conditions, scope, and submission guidelines. A safety regulations document (DVD-INS-003) outlines rules for external companies operating on-site. The annexes file (PSS - Annexes) probably provides supplementary project details or forms. The feasibility study report (WASTE2EMISSION0-Bilans-campagnes) may contain baseline data or previous campaign assessments relevant to the CO₂ capture project. The exact content of each file remains uncertain without direct access, but the filenames suggest a focus on contractual, technical, and safety documentation.
Source
Published on Belgian e-Procurement. Original title: réalisation d’une étude de faisabilité technique et d'un prédimensionnement pour le projet Waste2Emissions0.
Summary and assessment prepared by Pelenoir from the public notice (7 Nov 2026). The original notice and its documents are binding. Page updated 6 Nov 2026.