About the project
Comprehensive study contract for the new N54 road section between Lobbes and Erquelinnes, including preliminary design, environmental assessments, and technical studies. The project is structured in firm and conditional phases (tranches fermes and tranches conditionnelles) with a total execution period of four years.
Why it matters
N54 road studies draft the first layer of daily mobility, where geological and technical assessments meet environmental compliance. Engineers shape the quiet work of turning a missing link into a route.
Scope of work
The contract requires comprehensive preliminary studies for the new N54 road section, including environmental impact assessments, technical design, geological and hydrogeological studies, noise impact studies, visibility analyses, and ecological inventories. The project is divided into firm and conditional phases, with deliverables such as reports, drawings, and submission documents in French.
Deliverables
- preliminary design studies
- environmental impact assessments
- technical reports
- geological and hydrogeological studies
- noise impact studies
- visibility analyses
- ecological inventories
- submission documents
Required services
- transport engineering
- environmental consulting
- geotechnical studies
- noise impact assessment
- ecological studies
Pelenoir assessment
This project is primarily a road infrastructure study contract focused on technical engineering and planning for the N54 missing link. It also includes significant environmental and sustainability assessments, as well as surveying and geomatics work to support the preliminary design and technical studies.
-
Engineering 60%
Technical design, transport engineering, geological and hydrogeological studies, visibility analyses, and preliminary road infrastructure planning for the N54 missing link.
-
Sustainability 25%
Environmental impact assessments, noise impact studies, ecological inventories, and sustainability considerations for the road infrastructure project.
-
Surveying 15%
Topographic surveys, geodata collection, and mapping for the preliminary design and technical studies of the N54 road section.
How to take part
Who can apply
- open to qualified service providers
- ESPD (European Single Procurement Document) required
- non-disclosure agreement (NDA) required
What to submit
- completed ESPD form (French)
- technical and administrative documents in French
- electronic submission required
- signed submission report mandatory
Award criteria
- price (see tender documents for details)
Tender documents
The visible document package includes 128 files, primarily PDFs, DWG drawings, and Excel spreadsheets. The PDFs appear to contain environmental impact assessments (e.g., ecological inventories, noise studies), technical reports, and contractual documents related to the N54 road project. The DWG files likely represent topographic surveys and technical drawings of the proposed road section. Excel and Word files seem to include submission forms, templates, and administrative documents. The package also contains XML files for the ESPD submission. The exact content of individual files cannot be confirmed without access, but the filenames suggest a focus on preliminary studies and design documentation.
Source
Published on Belgian e-Procurement. Original title: N54-Lobbes-Erquelinnes : Marchés d'études pour la réalisation du chaînon manquant.
Summary and assessment prepared by Pelenoir from the public notice (9 Nov 2026). The original notice and its documents are binding. Page updated 9 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
