About the project

Study for the creation of one or two dedicated urban wastewater sludge mono-incineration units at the Thumaide Energy Recovery Centre (Ipalle) and/or the Virginal site (InBW), with an optional sludge drying unit at Thumaide only. The project is part of Wallonia's updated strategy for managing and recovering urban sludge led by SPGE.

Scope of work

Study for the technical and economic feasibility of urban wastewater sludge mono-incineration units at one or two sites, with an optional sludge drying unit at Thumaide. The study includes a firm phase (phases 1 and 2) and six conditional phases (TC1 to TC6), with decisions made at key milestones (D1 to D4). Bidders must price all phases and the mandatory option for sludge drying at Thumaide.

Deliverables

  • Technical and economic feasibility study report
  • Phase 1 and 2 deliverables (firm tranche)
  • Conditional phase deliverables (TC1 to TC6) upon decision by the contracting authority
  • Optional sludge drying study deliverables (if option is exercised)

Required services

  • Feasibility study for mono-incineration of urban wastewater sludge
  • Technical and economic analysis
  • Site investigations and environmental assessments
  • Project planning and budget estimation
  • Optional sludge drying study

Pelenoir assessment

This project is primarily an engineering and technical planning study for the feasibility of wastewater sludge mono-incineration and drying units in Wallonia. The scope includes technical, economic, and environmental assessments for industrial waste treatment infrastructure, with secondary specialist consulting for project planning and decision support.

  • Technical and economic feasibility study for wastewater sludge mono-incineration and drying units, including site investigations, environmental assessments, and engineering analysis for industrial waste treatment infrastructure.

  • Advisory services for project planning, budget estimation, and decision-making support for the contracting authority at key milestones (D1 to D4).

How to take part

Who can apply

  • Open to all economic operators
  • No reserved participation or execution
  • Electronic signature required for submission
  • E-invoicing required for contract execution

What to submit

  • Pricing for all tranches and the mandatory option
  • Methodology proposal
  • Team organisation, qualifications and experience
  • Project planning and organisation proposal
  • Electronic submission via the e-procurement platform

Award criteria

  • Cost (50 points)
  • Methodology quality (30 points)
  • Team organisation, qualification and experience (10 points)
  • Project planning and organisation (10 points)

Tender documents

The visible files likely include the main study contract specifications document (CSC_Etude_mono-incineration_Thumaide_V8) in both PDF and DOCX formats, detailing the technical, economic and procedural requirements for the feasibility study. The file 'Annexe D - DVD-INS-003 Règles sécurité entreprises extérieures rev03 2026 03.pdf' probably contains safety rules and protocols for external contractors working on-site. The fourth file appears to be a partial or corrupted filename reference, but its PDF type suggests it may be a supplementary document. The exact contents of the files cannot be confirmed without access, and no drawings or plans are explicitly named in the visible file list.