About the project

Preparation of design and cost documentation for the reconstruction of sidewalks along Kraszewskiego Street and Zachodnia Street, including drainage for Kraszewskiego Street and a sidewalk section from Wojska Polskiego Street to Wielki Kąt Street on Zachodnia Street.

Scope of work

Preparation of design and cost documentation for sidewalk reconstruction, including project documentation, technical specifications, and cost estimates. The project must ensure accessibility for disabled persons and universal design standards.

Deliverables

  • Design documentation for sidewalk reconstruction on Kraszewskiego Street (including drainage)
  • Design documentation for sidewalk reconstruction on Zachodnia Street (section from Wojska Polskiego Street to Wielki Kąt Street)
  • Technical specifications
  • Cost estimates

Required services

  • Civil engineering design services (road and drainage)
  • Cost estimation
  • Project supervision and documentation management

Pelenoir assessment

This project primarily involves civil engineering and technical planning for the reconstruction of sidewalks and drainage systems in an urban environment. While the focus is on engineering design, the scope also includes urban design considerations such as accessibility and integration with the existing public realm.

  • Design of sidewalk reconstruction, including civil engineering for pedestrian pathways and road drainage systems on Kraszewskiego and Zachodnia Streets. This includes technical planning for accessibility, universal design standards, and integration with existing urban infrastructure.

  • Urban integration of the sidewalk reconstruction, including spatial planning for pedestrian pathways, accessibility compliance, and coordination with the existing street layout and public realm.

How to take part

Who can apply

  • Contractors must designate a road design specialist with valid construction licenses and at least one completed road/drainage design project in the last 6 years
  • For Task 1, a specialist in thermal, ventilation, gas, water, and sewage systems with at least one completed drainage design project in the last 6 years is required
  • Submissions must comply with Polish construction law and EU-recognized professional qualifications

What to submit

  • Offers must be submitted electronically via the e-procurement platform
  • Documents must be in Polish and in specified formats (.pdf, .doc, .docx, .rtf, .odt, .xades, .rar, .zip)
  • Required forms and declarations as specified in the Terms of Reference (SWZ)

Award criteria

  • Price (60% weight)
  • Warranty period (20% weight; minimum 24 months required, higher periods scored)
  • Designer experience (20% weight; based on number of completed road design projects in the last 6 years)

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo kosztorysowej przebudowy ul. Kraszewskiego oraz ul. Zachodniej w zakresie wykonania chodnika w Milanówku..

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.