About the project

Comprehensive technical and cost concept for managing stormwater and meltwater in the Półwieś canal catchment in Opole, including hydrodynamic modelling, drainage system inventory, and investment proposals using green-blue infrastructure.

Scope of work

Development of a comprehensive technical and cost concept for stormwater and meltwater management in the Półwieś canal catchment, including drainage system inventory, hydrodynamic modelling, and investment proposals using green-blue infrastructure.

Deliverables

  • Inventory of the drainage system (Stage I)
  • Analysis of the study area with hydrodynamic modelling for sub-catchments (Stage II)
  • Technical and cost concepts (Stage III)

Required services

  • Preparation of project and cost estimation
  • Environmental planning
  • Engineering design services
  • Civil and water engineering design services

Pelenoir assessment

This project is primarily an engineering and technical planning initiative focused on stormwater and meltwater management for the Półwieś canal catchment. It involves hydrodynamic modelling, drainage system inventory, and civil/water engineering design, with secondary elements of urban design and sustainability planning to integrate green-blue infrastructure solutions.

  • Hydrodynamic modelling, drainage system inventory, civil and water engineering design, and technical concept development for stormwater and meltwater management in the Półwieś canal catchment.

  • Spatial planning and integration of green-blue infrastructure solutions for urban stormwater management within the catchment area.

  • Assessment of environmental impacts and sustainability aspects of the proposed stormwater management solutions, including climate resilience and certification considerations.

How to take part

Who can apply

  • Experience in preparing at least 2 technical concepts for stormwater drainage and retention systems in cities using hydrodynamic modelling compatible with GIS, including one catchment ≥500 ha
  • Experience in at least one concept based on a hydrodynamic model calibrated using rainfall-runoff measurement campaigns with local rain gauges and ≥3 flow measurement points
  • Experience in one comprehensive flood mitigation project for a city (>50,000 inhabitants)
  • Qualified personnel: project manager, stormwater designer, hydrodynamic modelling specialist, hydraulic monitoring specialist, GIS specialist

What to submit

  • Electronic offer via procurement platform
  • List of completed services with references
  • Personnel list with qualifications and experience
  • Statement on non-exclusion and compliance with participation conditions
  • Consortium agreement (if applicable)
  • Power of attorney (if applicable)
  • Commitment from resource-sharing entities (if applicable)

Award criteria

  • Price (60%)
  • Experience of stormwater designer (40%)

Source

Published on e-Zamowienia. Original title: Kompleksowa koncepcja techniczno-kosztowa zagospodarowania wód opadowych i roztopowych dla zlewni kanału Półwieś w Opolu.

Summary and assessment prepared by Pelenoir from the public notice (19 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.