Engineering · Service contract
Renovation of AaltoAlvar Aquatic Center Phase 4 Structural Design
Engineers: how do you ensure structural integrity while preserving a heritage swimming hall’s historic elements?
- Deadline
- 15 days left to apply
- Location
- Jyväskylä, Central Finland, Finland
- Declared value
- EUR 400 000
About the project
Structural design services for the renovation of the historic AaltoAlvar Aquatic Center, including the 1955 swimming hall section and related facilities such as pools, changing rooms, saunas, technical spaces, and water treatment areas. The project aims to extend the building's technical lifespan while preserving its cultural heritage and minimizing operational disruptions during construction.
Why it matters
Structural design for a heritage aquatic center ensures integrity while preserving historic elements like Aalto’s 1955 swimming hall.
Scope of work
Structural design services for the renovation of the AaltoAlvar Aquatic Center, including conceptual planning (hankesuunnittelu), general and implementation design, tender calculation documentation, construction-phase design, and post-completion warranty period tasks. The design must respect the building's heritage status and ensure operational continuity during construction.
Deliverables
- conceptual plans and reports for project decision-making
- general and implementation design documents
- tender calculation materials
- construction-phase design support
- commissioning and warranty period design tasks
Required services
- structural engineering design
- heritage building renovation design
- multi-discipline coordination
- cost estimation and phasing solutions
Pelenoir assessment
This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING as it focuses exclusively on structural design services for the renovation of a heritage aquatic center. The scope includes structural engineering, heritage building considerations, and multi-discipline coordination, with no evidence supporting other AEC business groups such as architecture, interior design, or urban planning.
-
Engineering 100%
Structural engineering design for the renovation of the AaltoAlvar Aquatic Center, including conceptual planning, general and implementation design, tender calculation documentation, construction-phase support, and warranty period tasks. This includes ensuring structural integrity, heritage preservation, and coordination with other disciplines.
How to take part
Who can apply
- compliance with Finnish public procurement regulations
- submission of European Single Procurement Document (ESPD)
- meeting minimum suitability and qualification requirements for the tenderer, responsible persons, and team
What to submit
- tender documents as described in the request for tender and its annexes
- documents demonstrating compliance with minimum requirements
Award criteria
- most economically advantageous tender based on price and quality criteria specified in the tender request
Source
Published on HILMA. Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, rakennesuunnittelu.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



