Engineering · Service contract
AaltoAlvari Swimming Center Phase 4 Water Treatment Renovation
Renovation of the water treatment systems and related facilities in the historic AaltoAlvari Swimming Center, including the 25-meter pool, technical rooms, and water treatment areas.
- Deadline
- 15 days left to apply
- Location
- Jyväskylä, Finland
- Declared value
- EUR 400 000
About the project
Renovation of the water treatment systems and related facilities in the historic AaltoAlvari Swimming Center, including the 25-meter pool, technical rooms, and water treatment areas. The project aims to extend the building's technical lifespan while preserving its cultural heritage values and minimizing operational disruptions during construction.
Why it matters
Water treatment renovation for a heritage swimming center modernizes systems while respecting historic constraints.
Scope of work
Design services for the renovation of water treatment systems in the AaltoAlvari Swimming Center, including conceptual planning (hankesuunnittelu), general and implementation planning, cost estimation, and construction-phase design. The project must respect the building's protected cultural heritage status and ensure minimal disruption to operations.
Deliverables
- Conceptual plans (hankesuunnittelu)
- General and implementation design documents
- Cost estimates and construction-phase design materials
- Acceptance and warranty-period design documents
Required services
- water treatment system design
- structural and technical system renovation planning
- heritage-compliant architectural design
- construction-phase design support
Pelenoir assessment
The project primarily involves engineering and technical planning for the renovation of water treatment systems in a historic swimming center, with secondary requirements for heritage-compliant architectural design and sustainability considerations. The scope is dominated by technical and structural upgrades, while preserving the building's cultural heritage.
-
Engineering 60%
Design and planning of water treatment systems, including technical rooms, infrastructure, and structural integration to ensure compliance with operational and heritage preservation requirements.
-
Architecture 30%
Heritage-compliant architectural design to preserve the cultural values of the historic AaltoAlvari Swimming Center, including integration of new technical systems with minimal disruption to the existing structure.
-
Sustainability 10%
Ensuring the renovated water treatment systems meet sustainability and building performance standards, including energy efficiency and operational longevity.
How to take part
Who can apply
- Compliance with Finnish public procurement regulations
- Submission of ESPD (European Single Procurement Document)
- Fulfillment of minimum suitability and qualification requirements for the tenderer and key personnel
What to submit
- Tender submission in Finnish
- Compliance with tender documents and appendices
- Submission via electronic procurement system
Award criteria
- Most economically advantageous tender based on price and quality criteria specified in the tender documents
Source
Published on HILMA. Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, vedenkäsittelysuunnittelu.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

