About the project

Geotechnical investigations for the RS-phase of the Lieksanjoki Bridge project, including site surveys, sampling, coordination with landowners, reporting, and precise measurement of investigation points. The contract is unit-price based and may also include water sampling, monitoring programs, research and development, and expert statements.

Scope of work

Geotechnical investigations for the RS-phase of the Lieksanjoki Bridge, including site surveys, sampling, coordination with landowners, reporting, precise measurement of investigation points, and potential water sampling and monitoring programs. The contract is unit-price based, and all costs related to the work must be included in the unit prices.

Deliverables

  • geotechnical investigation reports
  • site survey data and measurements
  • coordination with landowners
  • water sampling and monitoring reports (if included)
  • expert statements and research reports (if included)

Required services

  • geotechnical engineering
  • site investigation and sampling
  • coordination with stakeholders
  • reporting and documentation
  • water sampling and monitoring (optional)

Pelenoir assessment

This project is primarily focused on geotechnical investigations and technical engineering for the RS-phase of the Lieksanjoki Bridge, with a secondary emphasis on surveying and geomatics for precise measurement and data collection. The scope is explicitly limited to planning-phase activities and does not include architectural design, construction, or other AEC disciplines.

  • Geotechnical engineering investigations, including site surveys, sampling, precise measurement of investigation points, and technical reporting for the Lieksanjoki Bridge RS-phase.

  • Surveying 20%

    Precise measurement of investigation points, geodata collection, and mapping for the geotechnical investigations of the Lieksanjoki Bridge.

How to take part

Who can apply

  • compliance with exclusion criteria related to criminal convictions, tax and social security obligations, and financial stability
  • no conflicts of interest with the contracting authority
  • ability to provide required documentation and meet submission deadlines

What to submit

  • tender documents as specified in the procurement notice
  • compliance with unit-price based pricing
  • submission in Finnish

Award criteria

  • lowest price (Halvin hinta)

Source

Published on HILMA. Original title: Kt 73 Lieksanjoen silta, RS-vaiheen pohjatutkimukset.

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 6 Nov 2026.