Tenders of Europe project card: Katariina Swimming Pool HVAC and Water Treatment Design, Kotka, Finland
Featured in the daily edition, 28 Oct 2026

About the project

Design services for the HVAC (heating, ventilation, air conditioning) and water treatment systems of the Katariina Swimming Pool, including climate assessment. The project is part of a larger renovation and new construction of the Katariina swimming facility in Kotka.

Why it matters

HVAC and water treatment design for a municipal swimming pool needs engineers who can turn technical systems into daily use.

Scope of work

Design services for HVAC and water treatment systems for the Katariina Swimming Pool, including climate assessment. The design must adhere to a target cost estimate set by the client and remain within this budget throughout the project phases.

Deliverables

  • HVAC design plans
  • water treatment system design
  • climate assessment report

Required services

  • HVAC engineering
  • water treatment engineering
  • climate assessment

Pelenoir assessment

This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING as its scope is focused on the design of HVAC and water treatment systems, including climate assessment, for a public swimming facility. No other AEC business groups are supported by the extracted facts, as the tender does not mention architectural design, urban planning, interior design, or other disciplines.

  • Design of HVAC (heating, ventilation, air conditioning) systems and water treatment systems, including technical engineering and climate assessment for the Katariina Swimming Pool.

How to take part

Who can apply

  • Compliance with Finnish public procurement law (hankintalain 27 §)
  • Submission of European Single Procurement Document (ESPD)

What to submit

  • Tender submission via electronic means
  • ESPD submission
  • Proposals adhering to target cost estimate

Award criteria

  • Lowest price

Source

Published on HILMA. Original title: Uimala Katariinan LVISA- ja vedenkäsittelysuunnittelu.

Summary and assessment prepared by Pelenoir from the public notice (28 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.