Tenders of Europe project card: AaltoAlvar Swimming Center Phase 4 Electrical Design, Jyväskylä, Finland
Featured in the daily edition, 11 Nov 2026

About the project

Electrical design services for the Phase 4 renovation of the AaltoAlvar Swimming Center, a culturally and historically significant building designed by Alvar Aalto. The project includes the refurbishment of the original 1955 swimming hall section and related spaces such as pools, changing rooms, saunas, technical rooms, and water treatment areas. The renovation aims to extend the building's technical lifespan while preserving its heritage values and minimizing operational disruptions.

Why it matters

Electrical design for a heritage swimming center adapts systems to modern standards while preserving Aalto’s features.

Scope of work

Electrical design services for the Phase 4 renovation of the AaltoAlvar Swimming Center, including concept, general, and implementation design, cost estimation, construction-phase design, and post-construction tasks. The design must respect the building's heritage status and ensure operational continuity during construction. The project is divided into phases, with the client reserving the right to proceed to subsequent phases based on the approved concept design.

Deliverables

  • electrical design plans for renovation
  • cost estimates and comparisons
  • construction-phase design documentation
  • commissioning and warranty-period design tasks

Required services

  • electrical engineering design
  • heritage-sensitive design adaptation
  • phased renovation planning
  • cost estimation and comparison

Pelenoir assessment

The project scope is explicitly focused on electrical engineering design for the renovation of a heritage swimming center. The tender does not include architectural, interior, landscape, or other AEC disciplines beyond technical planning for electrical systems. The work is constrained by heritage preservation requirements and operational continuity needs during construction.

  • Electrical engineering design for the renovation of the AaltoAlvar Swimming Center, including concept, implementation, and construction-phase design, cost estimation, and post-construction tasks. The focus includes adapting electrical systems to respect heritage preservation requirements while ensuring operational continuity.

How to take part

Who can apply

  • compliance with Finnish public procurement regulations
  • submission of European Single Procurement Document (ESPD)

What to submit

  • tender submission in Finnish
  • compliance with tender documents and appendices

Award criteria

  • most economically advantageous tender (price and quality)

Source

Published on HILMA. Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, sähkösuunnittelu.

Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.