About the project

Preparation of design documentation for the reconstruction and expansion of Skaryszewska Street in Radom, covering approximately 1,800 meters between Słowackiego Street and Skrzydlata Street. The project includes redesigning and securing colliding technical infrastructure (water, sewage, energy, gas, and telecommunication networks) and obtaining necessary permits and approvals for road investment.

Scope of work

Preparation of design documentation for the reconstruction of Skaryszewska Street (approximately 1,800 meters) including redesign of technical infrastructure, obtaining permits, and completing formal and legal requirements such as opinions, agreements, and decisions.

Deliverables

  • Design documentation for road reconstruction
  • Documentation for securing colliding technical infrastructure (water, sewage, energy, gas, telecommunication networks)
  • Formal and legal documents (opinions, agreements, decisions)

Required services

  • Architectural design services (road infrastructure)
  • Coordination of technical infrastructure redesign
  • Obtaining permits and approvals for road investment

Pelenoir assessment

This project primarily involves engineering and technical planning for the reconstruction of an urban road and its associated technical infrastructure. Secondary aspects include urban design and planning to integrate the road into the existing urban environment, as well as project and construction management for permit coordination and regulatory compliance.

  • Design and technical planning for the reconstruction of Skaryszewska Street, including structural and civil engineering for road infrastructure, as well as coordination and redesign of colliding technical infrastructure (water, sewage, energy, gas, and telecommunication networks).

  • Urban design and spatial planning for the integration of the reconstructed road section into the existing urban fabric, including alignment with adjacent streets and public realm considerations.

  • Coordination of permit acquisition, formal and legal requirements (opinions, agreements, decisions), and oversight of the design documentation process to ensure compliance with regulatory and client requirements.

How to take part

Who can apply

  • Contractors must demonstrate experience in preparing at least two design documentations for construction or reconstruction of minimum class Z roads (1,500 meters or longer) within the last 5 years
  • Contractors must employ or have access to a road designer with valid construction licenses in road specialty and experience in designing minimum class Z roads (1,500 meters or longer) within the last 5 years
  • Consortium bidding allowed with joint fulfillment of technical or professional conditions

What to submit

  • Electronic offer using the e-Zamówienia Platform
  • Interactive Offer Form
  • Non-price Criteria Form
  • Statement under Art. 125(1) of the Public Procurement Law (Pzp)
  • Power of attorney (if applicable)
  • Bid bond proof (4,000 PLN)
  • Documents confirming experience and qualifications of the designated road designer

Award criteria

  • Price (60% weight)
  • Qualifications and professional experience of the designated road designer (40% weight)

Tender documents

The visible document package consists of a single ZIP file labeled 'SWZ74.2026.zip,' likely containing the full tender specifications (Specyfikacja Warunków Zamówienia). Based on the filename and context, this package probably includes the detailed terms of reference, contractual conditions, technical requirements, and submission forms for the design documentation procurement. The ZIP may also contain preliminary plans or drawings related to the road reconstruction project. However, the exact contents of the ZIP file cannot be confirmed without access, and no specific file list or detailed breakdown is visible in the tender context.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej rozbudowy DG 530143W ul. Skaryszewskiej w Radomiu na odc. od ul. Słowackiego do ul. Skrzydlatej.

Summary and assessment prepared by Pelenoir from the public notice (10 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.