About the project

Preparation of complete design and cost documentation for the construction of a municipal road in Prandocin-Wysiołek (approx. 380m) and a pedestrian crossing on voivodeship road 772, including obtaining necessary permits, approvals, and technical conditions. The documentation will serve as the basis for subsequent construction procurement.

Scope of work

Preparation of design and cost documentation for two separate infrastructure projects: (1) construction of a municipal road (approx. 380m) in Prandocin-Wysiołek, including drainage and traffic organization; (2) construction of a pedestrian crossing on voivodeship road 772, including all necessary approvals and technical conditions. The documentation must enable clear definition of the scope, location, technical parameters, and material solutions for subsequent construction procurement.

Deliverables

  • Building design (1 paper copy + 1 electronic copy)
  • Detailed design (3 paper copies + 1 electronic copy)
  • Bill of quantities (1 paper copy + 1 electronic copy)
  • Investment and offer cost estimates (1 paper copy + 1 electronic copy)
  • Technical specifications and organizational rules (1 paper copy + 1 electronic copy)
  • Approved traffic organization project (1 paper copy + 1 electronic copy)
  • All obtained approvals, opinions, decisions, and technical conditions
  • Complete design documentation in 4 paper copies and 1 electronic copy (for pedestrian crossing)
  • Editable files in agreed formats for drawings and documentation
  • Cost estimates and bills of quantities in PDF and editable formats

Required services

  • Engineering design services for roads
  • Cost estimation and project preparation
  • Traffic signal engineering services
  • Obtaining permits and approvals under Polish law (ZRID)

Pelenoir assessment

The project involves the preparation of design and cost documentation for a municipal road and pedestrian crossing, primarily requiring engineering and technical planning for civil infrastructure. Secondary project management tasks include cost estimation and coordination of approvals.

  • Engineering design for the municipal road and pedestrian crossing, including structural, civil, and traffic engineering solutions, drainage systems, and technical specifications required for construction.

  • Preparation of cost estimates, bills of quantities, and coordination of approvals, permits, and technical conditions to enable subsequent construction procurement.

How to take part

Who can apply

  • Contractor must not be subject to exclusion under Polish Public Procurement Law (PZP) Art. 109(1)(4)
  • Contractor must demonstrate availability of a chief designer with valid road engineering qualifications and experience in designing road construction or reconstruction under ZRID in the last three years
  • Contractor may submit one offer for either or both parts of the procurement

What to submit

  • Offer form (Załącznik nr 1 do SWZ)
  • Statement on meeting participation conditions and no grounds for exclusion (Załącznik nr 2 do SWZ)
  • Commitment of resource-sharing entity (Załącznik nr 3 do SWZ, if applicable)
  • Extract from National Court Register or Central Register of Economic Activity (if not publicly accessible)
  • Power of attorney or representation document (if applicable)
  • Statement for joint bidders (Załącznik nr 4 do SWZ, if applicable)
  • All documents must be signed with qualified electronic signatures (PAdES recommended; XAdES with separate signature file also accepted)
  • Files must comply with specified formats (e.g., PDF, DWG, DOCX, XLSX) and size limits (max 100 MB per file)

Award criteria

  • Price (60% weight)
  • Experience of the designer (40% weight, qualitative criterion)

Source

Published on e-Zamowienia. Original title: „Wykonanie dokumentacji projektowo – kosztorysowych dotyczących budowy drogi gminnej i przejścia dla pieszych na terenie Gminy Słomniki z podziałem na części”.

Summary and assessment prepared by Pelenoir from the public notice (17 Oct 2026). The original notice and its documents are binding. Page updated 16 Oct 2026.