About the project

Development of architectural, construction and cost documentation for a new athletics hall with changing and sanitary facilities for athletes on the modernized municipal stadium site in Bolesławiec. The project must comply with Polish Athletics Association (PZLA) standards and include certification of all equipment. Additional facilities such as exercise rooms and a gym may be included in consultation with the user.

Scope of work

Preparation of full architectural, construction and cost documentation for a new athletics hall with changing and sanitary facilities. The project must be approved by the Polish Athletics Association (PZLA) and include certified equipment. The documentation must align with the attached concept and the ongoing project for connecting a deep-well pump to the irrigation system at the municipal stadium.

Deliverables

  • architectural and construction documentation
  • cost estimate documentation
  • PZLA-approved project
  • certified equipment documentation
  • changing and sanitary facilities for athletes and footballers
  • exercise rooms and gym (if feasible)

Required services

Pelenoir assessment

This project primarily involves the design and documentation of a new athletics hall with changing and sanitary facilities, requiring architectural and engineering expertise. The scope includes architectural design as the dominant discipline, supported by structural, electrical, HVAC, and plumbing engineering, as well as equipment certification and cost documentation. The project is classified under multiple AEC business groups due to its multidisciplinary requirements.

  • Architectural concept and building design for the new athletics hall, including spatial planning, functional layout, and compliance with PZLA standards for sports facilities.

  • Structural, electrical, HVAC, plumbing, and gas installation design for the athletics hall and associated facilities, ensuring technical compliance and integration with the architectural design.

  • Certification of equipment and potential sustainability considerations for the athletics hall, including compliance with PZLA standards and any energy or performance-related requirements.

  • Preparation of cost documentation and coordination of the project's alignment with the broader stadium modernization efforts, including integration with the irrigation system project.

How to take part

Who can apply

  • Experience in designing athletics halls with a volume of at least 40,000 m³ approved by PZLA within the last 5 years
  • Qualified personnel with valid construction licenses in architectural, structural, electrical, HVAC, plumbing and gas design
  • Consortium or subcontractor arrangements allowed with documented commitments

What to submit

  • Completed offer form (Załącznik nr 1 do SWZ)
  • Legal status documents (e.g., registry excerpts)
  • Power of attorney for consortium members (if applicable)
  • Statutory declarations (Załącznik nr 2 do SWZ)
  • Commitment letters from subcontractors (Załącznik nr 3 do SWZ, if applicable)
  • Declaration of tasks for consortium members (Załącznik nr 4 do SWZ, if applicable)

Award criteria

  • Price (100% weight)

Tender documents

The visible document package includes three files: a DOCX file labeled 'SWZ_45.2026' likely containing the full tender specifications and conditions (Specyfikacja Warunków Zamówienia). A ZIP file named 'ZAŁĄCZNIK_A_45.2026' probably contains the concept drawings, technical annexes or supplementary plans referenced in the tender. The PDF file 'ZAŁĄCZNIK_B_WZÓR_UMOWY_45.2026' is expected to provide the draft contract template. The exact contents of the ZIP archive remain unknown, as the files were not downloaded or analyzed.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo-kosztorysowej budowy obiektu halowego na stadionie miejskim.

Summary and assessment prepared by Pelenoir from the public notice (26 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.