About the project

Design services for the modernisation of an artificial turf pitch and the construction of new changing rooms with sanitary facilities, including demolition of an existing building, divided into two separate tasks.

Scope of work

Design services for two tasks: (1) modernisation of an artificial turf pitch, and (2) construction of new changing rooms with sanitary facilities, including demolition of an existing building. Task 1 duration: 70 days; Task 2 duration: 154 days.

Deliverables

  • architectural design for pitch modernisation
  • architectural design for new changing rooms and sanitary facilities
  • demolition design for existing building
  • submission of required documentation and forms

Required services

Pelenoir assessment

This project primarily involves architectural design for the modernisation of a sports pitch and the construction of new changing rooms with sanitary facilities. Engineering and technical planning are required for structural and demolition design, while project and construction management supports coordination and documentation submission.

  • Architectural design for the modernisation of the artificial turf pitch and the new changing rooms with sanitary facilities, including conceptual and detailed design development.

  • Structural and technical engineering for the new changing rooms and sanitary facilities, including demolition design for the existing building and integration of building services.

  • Coordination of design tasks, submission of documentation, and compliance with procurement requirements for the two project tasks.

How to take part

Who can apply

  • Experience as a designer (evaluated under qualitative criteria)

What to submit

  • Completed offer forms (Załącznik nr 1a/1b)
  • Documentation of designer experience (Załącznik nr 2a/2b)
  • Other required attachments (Załącznik nr 3a/3b to 6a/6b)

Award criteria

  • Price (60%)
  • Designer experience (40%)

Tender documents

The visible document package includes site plans and location maps (JPG, PDF) showing the pitch, existing building, and proposed new facilities. It contains functional programmes and specifications for the changing rooms and sanitary building (PDF). Submission forms and offer templates (DOCX, DOC) are provided for both tasks, along with attachments detailing experience requirements and contractual conditions. Three ZIP archives appear to contain photographs of the existing building, pitch, and site, but their exact contents remain unknown without download.

Source

Published on e-Zamowienia. Original title: „PROJEKT MODERNIZACJI BOISKA ZE SZTUCZNĄ NAWIERZCHNIĄ ORAZ BUDOWY ZAPLECZA SZATNIOWO-SANITARNEGO NA BOISKACH BOCZNYCH PRZY UL. GLIWICKIEJ” , z podziałem na dwa zadania.