About the project

Design documentation for two small ski jumps (HS20 and HS37) with a shared landing zone, judges' stand, and supporting infrastructure including site development, utilities, and lighting. The project includes geotechnical surveys, obtaining permits, and preparing a full construction permit application for the first phase of a larger ski jump complex.

Scope of work

Full multi-discipline design documentation for two small ski jumps (HS20 and HS37) with a shared landing zone, judges' stand, and supporting infrastructure. The scope includes geotechnical surveys, obtaining all required permits, preparing a construction permit application, and providing author's supervision during construction.

Deliverables

  • project for site development
  • architectural and construction design
  • technical design
  • execution designs for all disciplines
  • bill of quantities
  • investor's cost estimates
  • technical specifications for execution and acceptance of construction works (STWiOR)
  • geological surveys (drillings, geotechnical opinion)
  • construction permit application with all required attachments
  • updated cost estimates during the warranty period (max. once every 6 months)

Required services

  • engineering design services
  • project supervision services
  • geotechnical surveys
  • obtaining permits and approvals
  • author's supervision during construction (estimated 15 site visits)

Pelenoir assessment

The project primarily involves the architectural and engineering design of two small ski jumps with shared infrastructure, supported by site development planning and geotechnical surveys. The scope is dominated by architectural and structural design, with secondary contributions from urban planning and surveying disciplines.

  • Architectural concept and building design for the ski jumps HS20 and HS37, including the shared landing zone, judges' stand, and integration with the surrounding site development.

  • Structural, civil, and technical engineering for the ski jumps, including load-bearing calculations, infrastructure utilities, lighting, and geotechnical stability of the landing zone and supporting structures.

  • Site development planning, including spatial organization of the ski jumps, judges' stand, and supporting infrastructure to ensure functional and aesthetic integration with the surrounding environment.

  • Surveying 10%

    Geotechnical surveys, including drillings and geotechnical opinions, to assess soil conditions and inform the structural and civil engineering design of the ski jumps.

How to take part

Who can apply

  • At least one service in the last 3 years: design documentation for construction, expansion, or modernization of ski jumps
  • At least one person with unlimited construction design license in structural-engineering discipline and 2+ years of experience, including at least one ski jump design project
  • All personnel must be fluent in Polish or provide a translator at their own cost
  • Consortium members may jointly meet the experience and personnel requirements

What to submit

  • Offer form (Załącznik nr 1 do SWZ) with lump-sum price
  • Statutory declarations and documents confirming eligibility and absence of exclusion grounds
  • List of completed services with references
  • List of personnel with qualifications, licenses, and experience
  • Documents in Polish
  • Electronic submission via the procurement platform with qualified electronic signature or trusted signature

Award criteria

  • Price (100%)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla Etapu I inwestycji – tj. skoczni HS20 i HS37 ze wspólnym zeskokiem, stanowiskiem sędziowskim oraz niezbędną infrastrukturą.

Summary and assessment prepared by Pelenoir from the public notice (24 Nov 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.