About the project

Design and cost documentation for modernising a village hall in Dorożki, including demolition of the existing wooden floor and stage, and design of a new insulated floor on ground with ceramic tile finish. Includes up to five site visits for author’s supervision.

Scope of work

Preparation of complete design and cost documentation for modernising the floor of a village hall, including demolition of existing wooden floor and stage, design of a new insulated floor on ground with ceramic tile finish, and up to five site visits for author’s supervision.

Deliverables

  • Complete design documentation for modernisation
  • Cost estimate documentation
  • Author’s supervision services (up to five site visits)

Required services

Pelenoir assessment

This project involves the modernisation of a village hall, focusing on the design and cost documentation for a new insulated floor with ceramic tile finish. The scope explicitly supports both architectural design and structural engineering, with the architectural aspects (e.g., floor layout, material selection) forming the primary discipline, and structural engineering (e.g., load-bearing design, insulation) as a secondary but essential component.

  • Architectural design of the village hall modernisation, including the demolition of the existing wooden floor and stage, and the conceptual and technical design of the new insulated floor with ceramic tile finish.

  • Structural engineering design for the new insulated floor on ground, ensuring technical feasibility, load-bearing capacity, and compliance with construction standards.

How to take part

Who can apply

  • At least one similar design service completed in the last three years for a building with a minimum volume of 1000 m³
  • Design team members must hold valid Polish construction design licences (architectural and structural) with at least three years of professional experience

What to submit

  • Completed offer form (Załącznik nr 1)
  • Statement on meeting participation conditions (Załącznik nr 2)
  • Statement on absence of exclusion grounds (Załącznik nr 3)
  • Commitment to provide resources (Załącznik nr 4)
  • Statement on services performed by individual contractors (Załącznik nr 5)
  • List of similar services performed (Załącznik nr 6)
  • List of personnel assigned to the contract (Załącznik nr 9)

Award criteria

  • Price (60% weight)
  • Warranty and guarantee period (20% weight)
  • Experience of the assigned designer (20% weight)

Tender documents

The visible document package includes the main tender specifications (SWZ) and its annexes. The files likely contain the full terms of reference for the design and cost documentation, including technical requirements for the new insulated floor and ceramic tile finish. Submission forms, eligibility declarations, and a draft contract are also present. The annex titled 'Opis Przedmiotu Zamówienia' probably details the exact scope of work and technical conditions. The package does not appear to include detailed architectural drawings or construction plans at this stage.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo–kosztorysowej dotyczącej modernizacji świetlicy w miejscowości Dorożki.

Summary and assessment prepared by Pelenoir from the public notice (21 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.