About the project

Design of a 200 m³ water retention reservoir including technological expansion of the existing Water Treatment Plant, new pumping station, underground pipelines, modernised water network, and automation and control systems.

Scope of work

Preparation of comprehensive multi-discipline design documentation for a new 200 m³ water retention reservoir at the existing Water Treatment Plant, including a second-stage pumping station, underground pipelines, modernisation of the water network, and automation and control systems.

Deliverables

  • Comprehensive multi-discipline design documentation
  • Technological expansion of the Water Treatment Plant
  • 200 m³ water retention reservoir with necessary fittings and technological equipment
  • Second-stage pumping station
  • Underground pipelines connecting new facilities to existing infrastructure
  • Modernisation of the existing water network between the Water Treatment Plant and deep wells
  • Automation and control system

Required services

  • Engineering design services
  • Civil and water engineering design
  • Pipeline design
  • Project supervision and documentation management

Pelenoir assessment

This project is primarily an engineering and technical planning assignment focused on the design of water infrastructure, including a retention reservoir, pumping station, pipelines, and network modernisation. A secondary component involves project and construction management to oversee the design process and ensure documentation compliance.

  • Design of the 200 m³ water retention reservoir, structural and civil engineering for the new pumping station, underground pipelines, and modernisation of the water network, including technical specifications and engineering calculations.

  • Supervision of the design documentation process, coordination of multi-discipline design work, and management of the project timeline and deliverables to ensure compliance with the tender requirements.

How to take part

Who can apply

  • No restrictions to specific types of contractors (art. 94 ustawy not applied)
  • Contractors must meet standard public procurement eligibility criteria under Polish law

What to submit

  • Offer prepared using the interactive form on the e-Zamówienia Platform
  • Statement on eligibility (art. 125 ust. 1 ustawy Pzp) using the provided template
  • Power of attorney or document confirming representation (if applicable)

Award criteria

  • Price (60% weight)
  • Professional experience of the designer (40% weight)

Tender documents

The visible files include three items: a PDF titled 'Specyfikacja Warunków Zamówienia' (Contract Conditions Specification), which likely contains the full tender conditions, eligibility rules, and procedural requirements. A ZIP file named 'Załącznik nr 4 do SWZ – Szczegółowy opis przedmiotu zamówienia' (Detailed Description of the Subject of the Contract) probably holds the technical brief, site plans, and engineering specifications for the water retention reservoir and associated infrastructure. The third file, 'Załącznik nr 2 do SWZ – Formularz oświadczenia', is a PDF form for the contractor’s eligibility declaration under Polish procurement law. The exact content of the ZIP archive remains unknown, but its label suggests it contains the core project brief and technical details.

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla zadania: „Budowa zbiornika retencyjnego na ujęciu wody w Szczerbięcinie”.

Summary and assessment prepared by Pelenoir from the public notice (17 Nov 2026). The original notice and its documents are binding. Page updated 16 Nov 2026.