About the project

Design and construction supervision for refurbishment of existing greenway due to structural disorders and extension of the current route with new landscaping and connections to northern and southern areas

Scope of work

Design services and construction supervision for two lots: (1) refurbishment of existing greenway due to structural disorders and site redevelopment, (2) extension of the current greenway with new landscaping and connections to northern and southern areas

Deliverables

  • design plans and specifications for refurbishment and extension
  • construction supervision documentation
  • final project report

Required services

  • design services (Maîtrise d’œuvre)
  • construction supervision
  • landscape architecture
  • urban infrastructure planning

Pelenoir assessment

This project focuses on the refurbishment and extension of a greenway and cycle route, with a primary emphasis on landscape architecture for outdoor environment design and planting. Urban design and planning are also supported for integrating the route with urban infrastructure, while project and construction management services are required for supervision and delivery.

  • Design of outdoor landscaping, planting, and open-space environments for the greenway refurbishment and extension, including integration with the surrounding natural and urban context.

  • Urban infrastructure planning for the greenway's connections to northern and southern areas, ensuring seamless integration with the existing urban fabric and mobility networks.

  • Construction supervision and project management for the refurbishment and extension works, ensuring compliance with design plans and contractual requirements.

How to take part

Who can apply

  • open to all qualified tenderers
  • SME-suitable
  • electronic signature required for submission
  • e-invoicing required for contract execution

What to submit

  • tender documents in French
  • electronic submission via designated platform
  • performance bond or equivalent guarantee

Source

Published on BOAMP. Original title: Maîtrise d’œuvre pour la réalisation de travaux d’aménagement sur la véloroute voie-verte.