Tenders of Europe project card: Schoolyard renaturation: landscape design for three tropical primary schools, Capesterre-Belle-Eau, France
Featured in the daily edition, 14 Nov 2026

About the project

Assistance to the contracting authority for landscape design services to renature the schoolyards of three primary schools in Capesterre-Belle-Eau, focusing on climate resilience, native vegetation and student usability.

Why it matters

Schoolyard renaturation in Capesterre-Belle-Eau phases over three years, turning native vegetation into the first quiet rules of student play.

In Capesterre-Belle-Eau, the landscape design for three primary schoolyards will be phased over three years to ensure student usability throughout the process.

This phasing isn’t just a logistical detail. It becomes the first quiet rule that shapes how the design team balances climate resilience, native vegetation and daily play. For landscape architects, it means that every planting decision must account for both immediate usability and long-term ecological goals. The three-year timeline turns the brief into a contract between the schoolyard and its users, where disruption is minimised and benefits are incremental.

Scope of work

Landscape design assistance for the renaturation of three primary schoolyards, including climate resilience, native vegetation, phasing over three years and compliance with environmental regulations.

Deliverables

  • Methodology proposal
  • Planning and schedule
  • Landscape design for three schoolyards
  • References and CVs of key team members

Required services

  • Landscape architecture
  • Project management assistance (Assistance à maîtrise d'ouvrage)
  • Technical assistance
  • Ecological engineering

Pelenoir assessment

This project primarily involves landscape architecture for the renaturation of three primary schoolyards, with a secondary focus on project management assistance to support the contracting authority. The scope emphasizes outdoor design, native vegetation, and climate resilience, while also requiring coordination and oversight services.

  • Design of outdoor spaces for three primary schoolyards, including native vegetation, climate resilience, and student usability enhancements.

  • Assistance to the contracting authority (AMO) for project coordination, phasing, compliance with environmental regulations, and oversight of landscape implementation.

How to take part

Who can apply

  • Minimum three references of similar projects (descriptif, MO, montant travaux, date livraison)
  • Professional liability insurance
  • Financial capacity declaration
  • CVs of project manager and key team members
  • Possible use of subcontractors or team members' capacities

What to submit

  • Formulaire DC1 or equivalent (letter of candidacy)
  • Formulaire DC2 or equivalent (declaration of candidate)
  • Financial statements for the last three years
  • Professional references (minimum three)
  • CVs of project manager and key team members
  • Insurance attestation

Award criteria

  • Technical value of the offer (60%)
  • Price of services (honoraria) (30%)
  • Proposed planning and deadlines (10%)

Source

Published on BOAMP. Original title: MISSION D'ASSISTANCE A MAITRISE D'OUVRAGE CONCEPTEUR PAYSAGISTE POUR LA RENATURATION DES COURS D'ECOLES DE LA VILLE DE CAPESTERRE-BELLE-EAU.

Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.