About the project

Planned renaturation, landscape redesign and spatial recomposition of the seafront and Boulevard des Sables in Biscarrosse, including green spaces, beach areas, earthworks, engineering and site preparation works.

Scope of work

Design and implementation of renaturation, landscape requalification and spatial recomposition for the seafront and Boulevard des Sables in Biscarrosse. The project includes green spaces, beach areas, earthworks, engineering studies and site preparation works.

Deliverables

  • landscape design and implementation
  • renaturation of seafront areas
  • beach requalification
  • earthworks and site preparation
  • engineering studies

Required services

Pelenoir assessment

This project focuses on the renaturation and landscape requalification of Biscarrosse's seafront, combining landscape architecture, urban design, and engineering. The primary scope involves outdoor environmental design and green infrastructure, with secondary emphasis on spatial recomposition and technical planning for site preparation and earthworks.

  • Design and implementation of renaturation and landscape requalification for the seafront and Boulevard des Sables, including green spaces, beach areas, and outdoor environmental design.

  • Spatial recomposition and urban design of the seafront and Boulevard des Sables, including public realm planning and integration of green infrastructure.

  • Civil engineering studies, earthworks, site preparation, and technical planning for the seafront and beach areas.

How to take part

Who can apply

  • ESPD (European Single Procurement Document) required for exclusion grounds and selection criteria
  • SME-suitable
  • e-invoicing required
  • performance conditions apply

What to submit

  • ESPD submission
  • non-restricted documents (see consultation documents)

Source