Architecture · Service contract
Access control system replacement for Metz courthouse
Replacement of the access control system at the Metz judicial building (PJ de Metz), including design and implementation of new security infrastructure.
- Deadline
- 16 days left to apply
- Location
- Metz, France
About the project
Replacement of the access control system at the Metz judicial building (PJ de Metz), including design and implementation of new security infrastructure.
Scope of work
Design and implementation of a new access control system for the Metz judicial building, including all necessary studies, plans, and coordination for system replacement.
Deliverables
- Mastery of work (maîtrise d’œuvre) services for access control system replacement
Required services
- Mastery of work (maîtrise d’œuvre)
- Access control system design
Pelenoir assessment
This project primarily involves the design and implementation of a new access control system for a judicial building, requiring architectural coordination and technical engineering. The scope is split between architectural design (maîtrise d’œuvre) and technical planning for system integration.
-
Architecture 70%
Design of the new access control system, including spatial integration, functional layout, and architectural coordination within the judicial building.
-
Engineering 30%
Technical planning and engineering of the access control system, including structural and infrastructure adaptations, security protocols, and system integration.
How to take part
Award criteria
- environmental
Source
Published on BOAMP. Original title: Mission de maitrise d’œuvre relative au remplacement du système d’accès au PJ de Metz.
Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 19 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

