Tenders of Europe project card: Vantaa city electric vehicle charging infrastructure electrical design, Vantaa, Finland
Featured in the daily edition, 28 Oct 2026

About the project

Electrical design services for the construction of electric vehicle charging infrastructure at approximately 117 properties in Vantaa, including site surveys, cost estimation, and implementation planning. The project is planned to start in November 2026 and span approximately two years.

Why it matters

Electrical design for EV charging infrastructure at Vantaa’s properties turns site surveys into public accountability.

Scope of work

Deliverables

  • site surveys for electric vehicle charging infrastructure
  • cost estimation (urakkalaskenta)
  • implementation planning (toteutussuunnittelu)

Required services

  • electrical design services

Pelenoir assessment

This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING due to its focus on electrical engineering design services for the construction of electric vehicle charging infrastructure across multiple properties. The scope does not explicitly support other AEC business groups such as architecture, urban planning, or construction management.

  • Electrical engineering design for the installation of electric vehicle charging infrastructure, including site surveys, cost estimation, and implementation planning for approximately 117 properties.

How to take part

Who can apply

  • compliance with national procurement legislation
  • compliance with KSE2013 general terms for consulting services (with Vantaa city modifications)
  • eligibility requirements as specified in tender documents

What to submit

  • tender submission via Cloudia procurement portal
  • documents in Finnish

Award criteria

  • most economically advantageous tender based on fixed total price (kattohinta)

Source

Published on HILMA. Original title: Vantaan kaupungin sähköajoneuvojen latausasemien rakentamisen sähkösuunnittelun hankinta.

Summary and assessment prepared by Pelenoir from the public notice (28 Oct 2026). The original notice and its documents are binding. Page updated 27 Oct 2026.