About the project

Design of complete project documentation for the construction of a 2.5 km sidewalk along the northern side of Provincial Road 773, including drainage, geotechnical surveys, environmental impact assessments, and obtaining all required permits and approvals. The project is divided into three stages and includes preparation of construction and execution designs, cost estimates, and supervision during implementation.

Scope of work

Preparation of complete design documentation for a 2.5 km sidewalk along Provincial Road 773, including geotechnical surveys, environmental impact assessments, drainage systems, traffic organization, and obtaining all necessary permits and approvals. The project is divided into three stages and requires multi-disciplinary design (road, sanitary, electrical, and landscaping).

Deliverables

  • Map for design purposes (including electronic version)
  • Preliminary design (concept) for approval
  • Geotechnical survey and subsoil assessment
  • Materials for required opinions, agreements, and permits (including ZUDP approvals)
  • Water law permit application (if required)
  • Environmental impact report (if required)
  • Multi-disciplinary construction and execution design (including site development, longitudinal and cross-sectional profiles, media protection/relocation, driveway adjustments)
  • Traffic organization design (permanent and temporary)
  • Tree inventory and management plan (if required)
  • Bill of quantities (2 paper copies + 1 electronic)
  • Investor cost estimate (2 paper copies + 1 electronic)
  • Technical specifications (2 paper copies + 1 electronic)
  • Health and safety documentation (2 paper copies + 1 electronic)
  • Complete application for road investment permit, building permit, or construction notification
  • Authorial supervision during implementation

Required services

  • Civil engineering design (road and drainage)
  • Geotechnical surveys
  • Environmental impact assessment
  • Traffic organization design
  • Landscaping and tree management design
  • Cost estimation and bill of quantities preparation
  • Permit and approval coordination

Pelenoir assessment

This project primarily involves the design of a 2.5 km sidewalk along Provincial Road 773, with a strong focus on civil engineering and technical planning for road infrastructure, drainage, and traffic organization. Secondary disciplines include urban design and planning for site development and landscaping, geomatics for geotechnical surveys, and sustainability for environmental impact assessments and permits.

  • Civil engineering design for the sidewalk, drainage systems, traffic organization, and coordination of geotechnical and environmental assessments. Preparation of construction and execution designs, including longitudinal and cross-sectional profiles, media protection/relocation, and driveway adjustments.

  • Integration of the sidewalk into the existing urban fabric, including site development, landscaping, tree management, and alignment with local spatial planning requirements.

  • Surveying 10%

    Geotechnical surveys, subsoil assessment, and preparation of a map for design purposes, including electronic versions.

  • Environmental impact assessment, water law permit application (if required), and coordination of sustainability-related approvals.

How to take part

Who can apply

  • Contractors must have experience in designing at least one similar infrastructure project (road, sidewalk, or cycle path) of minimum 300 m length within the last 3 years
  • Project team must include a road design engineer with unlimited design qualifications and experience in designing roads or sidewalks over 300 m
  • Project team must include a sanitary installations designer with unlimited qualifications and experience in designing drainage systems over 300 m
  • Consortium members must designate a lead representative and specify individual responsibilities

What to submit

  • Offer form (Załącznik nr 1)
  • Statements on meeting participation conditions (Załącznik nr 2 and 2a)
  • Exclusion statements (Załącznik nr 3 and 3a)
  • Consortium member statement (if applicable, Załącznik nr 4)
  • List of personnel assigned to the project (Załącznik nr 5)
  • List of previously executed services (Załącznik nr 6)
  • All documents must be submitted in Polish and electronically via the e-Zamówienia platform

Award criteria

  • Price (60% weight)
  • Qualifications and experience of the assigned personnel (40% weight)

Tender documents

The visible document package includes the tender specifications (SWZ) in PDF format, which likely contains detailed requirements, scope, and procedural rules for the design project. The DOCX files include standardized forms for offer submission, declarations of eligibility and non-exclusion, and statements for consortium members. These forms are likely used by bidders to formally declare compliance with the tender conditions. The package also contains a contract template (PDF) outlining the terms and conditions for the selected contractor. The documents appear to be administrative and procedural, supporting the submission and evaluation process rather than containing technical drawings or detailed design files.

Source

Published on e-Zamowienia. Original title: Opracowanie kompletnej dokumentacji projektowej dla zadania pn. „Budowa chodnika na odc. 100 km 0+000 do odc. 110 km 0+682 po północnej stronie drogi wojewódzkiej nr 773 (...).

Summary and assessment prepared by Pelenoir from the public notice (21 Oct 2026). The original notice and its documents are binding. Page updated 20 Oct 2026.