About the project

Noise investigation for the S8 Marchfeld Expressway West section as part of an ongoing complaint procedure during the planning phase (Einreichprojekt). The goal is to achieve legally binding project approval through the Federal Administrative Court (BVwG) process.

Scope of work

Conduct a noise investigation for the S8 Marchfeld Expressway West section as part of an ongoing complaint procedure during the planning phase. The objective is to achieve legally binding project approval through the Federal Administrative Court (BVwG) process.

Deliverables

  • Noise investigation report for the planning phase (Einreichprojekt)

Required services

  • noise protection study
  • environmental impact assessment support
  • planning phase documentation

Pelenoir assessment

This project is primarily a technical engineering assignment focused on noise investigation and environmental impact assessment for a transport infrastructure project during its planning phase. It also includes specialist consulting to support the complaint procedure and achieve legally binding project approval.

  • Technical noise investigation, environmental impact assessment support, and planning phase documentation for the S8 Marchfeld Expressway West section to achieve legally binding project approval.

  • Specialist advisory support for the complaint procedure, including legal and procedural compliance to facilitate project approval through the Federal Administrative Court (BVwG) process.

How to take part

Who can apply

  • Eligibility criteria specified in tender documents
  • Consortium allowed (maximum 2 members)

What to submit

  • Offers must be submitted electronically via www.provia.at
  • Submission language: German
  • Electronic invoicing required

Award criteria

  • Price (net total price as per documents)
  • Quality (offered quality as per documents)

Tender documents

The visible document package includes a ZIP file named 'AU_Lärm_S8West.zip,' likely containing noise study-related documents for the S8 Marchfeld Expressway West section. The file name suggests it may include technical reports, noise measurement data, or environmental impact assessments relevant to the planning phase. An XLS file is referenced for document uploads, which may contain submission forms or templates for bidder responses. The exact contents of the ZIP file remain uncertain, as the portal requires login and the files were not downloaded. No detailed breakdown of the ZIP contents is provided in the visible context.

Source

Published on Austrian Public Procurement Search. Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Lärmtechnische Untersuchung im anhängigen Beschwerdeverfahren in der Planungsphase EP.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.