Engineering · Service contract
District heating plant: new biomass facility with 2,000 kW thermal output
Construction of a new biomass district heating plant with two 800 kW biomass boilers, one 400 kW biomass boiler, fuel storage, chimneys, flue gas cleaning, ash removal and all necessary auxiliary systems including a 100 m³ load control storage tank, pressure…
- Deadline
- 23 days left to apply
- Location
- Weitra, Lower Austria, Austria
About the project
Construction of a new biomass district heating plant with two 800 kW biomass boilers, one 400 kW biomass boiler, fuel storage, chimneys, flue gas cleaning, ash removal and all necessary auxiliary systems including a 100 m³ load control storage tank, pressure maintenance system, electrical engineering, hydraulic systems and steel construction.
Scope of work
Planning services and site supervision (ÖBA) for a new biomass district heating plant with 2,000 kW thermal output, including two 800 kW biomass boilers, one 400 kW biomass boiler, fuel storage, chimneys, flue gas cleaning, ash removal, a 100 m³ load control storage tank, pressure maintenance system, electrical engineering, hydraulic systems and steel construction.
Deliverables
- technical planning for mechanical and electrical building services
- site supervision (ÖBA)
Required services
- technical planning for mechanical and electrical building installations
- site supervision
Pelenoir assessment
This project involves the planning and construction of a biomass district heating plant, primarily requiring engineering and technical planning for mechanical and electrical systems, alongside site supervision. The scope is dominated by technical engineering work, with secondary involvement in construction management.
-
Engineering 70%
Technical planning for mechanical and electrical building services, including biomass boilers, fuel storage, flue gas cleaning, ash removal, hydraulic systems, pressure maintenance, electrical engineering, and steel construction for the district heating plant.
-
Site supervision (ÖBA) to ensure compliance with planning, quality, and safety standards during the construction of the biomass district heating plant.
How to take part
What to submit
- names and professional qualifications of personnel assigned to the contract (not required)
- electronic submission allowed
Source
Published on Austrian Public Procurement Search. Original title: Planungsleistung + ÖBA Fernheizwerk Weitra.
Summary and assessment prepared by Pelenoir from the public notice (23 Nov 2026). The original notice and its documents are binding. Page updated 23 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.