About the project

Construction of a new biomass district heating plant with two 800 kW biomass boilers, one 400 kW biomass boiler, fuel storage, chimneys, flue gas cleaning, ash removal and all necessary auxiliary systems including a 100 m³ load control storage tank, pressure maintenance system, electrical engineering, hydraulic systems and steel construction.

Scope of work

Planning services and site supervision (ÖBA) for a new biomass district heating plant with 2,000 kW thermal output, including two 800 kW biomass boilers, one 400 kW biomass boiler, fuel storage, chimneys, flue gas cleaning, ash removal, a 100 m³ load control storage tank, pressure maintenance system, electrical engineering, hydraulic systems and steel construction.

Deliverables

  • technical planning for mechanical and electrical building services
  • site supervision (ÖBA)

Required services

  • technical planning for mechanical and electrical building installations
  • site supervision

Pelenoir assessment

This project involves the planning and construction of a biomass district heating plant, primarily requiring engineering and technical planning for mechanical and electrical systems, alongside site supervision. The scope is dominated by technical engineering work, with secondary involvement in construction management.

  • Technical planning for mechanical and electrical building services, including biomass boilers, fuel storage, flue gas cleaning, ash removal, hydraulic systems, pressure maintenance, electrical engineering, and steel construction for the district heating plant.

  • Site supervision (ÖBA) to ensure compliance with planning, quality, and safety standards during the construction of the biomass district heating plant.

How to take part

What to submit

  • names and professional qualifications of personnel assigned to the contract (not required)
  • electronic submission allowed

Source

Published on Austrian Public Procurement Search. Original title: Planungsleistung + ÖBA Fernheizwerk Weitra.