Engineering · Service contract
Gas and Heat Network BWI and Planning Framework Agreement
Framework agreement for BWI works (installation of mechanical equipment) and planning services in gas and heat networks at Eisenstadt, Siegendorf, and Frauenkirchen locations in Burgenland, Austria
- Deadline
- Closed 3 days ago
- Location
- Eisenstadt, Siegendorf, Frauenkirchen, Burgenland, Austria
- Declared value
- EUR 8.1 m
About the project
Framework agreement for BWI works (installation of mechanical equipment) and planning services in gas and heat networks at Eisenstadt, Siegendorf, and Frauenkirchen locations in Burgenland, Austria
Scope of work
Deliverables
- BWI works (mechanical installation)
- planning services for gas and heat networks
Required services
- installation of mechanical equipment
- planning and design services
Pelenoir assessment
This project primarily involves engineering and technical planning for gas and heat network infrastructure, with a secondary focus on the physical installation of mechanical equipment. The scope supports two AEC business groups: technical planning for system design and compliance, and construction-related installation works.
-
Engineering 60%
Technical planning and design services for gas and heat network infrastructure, including mechanical equipment integration, system layout, and compliance with technical standards.
-
Installation of mechanical equipment (BWI works) in gas and heat networks, including physical construction, assembly, and integration of components at the specified locations.
How to take part
Who can apply
- Suitability for small and medium-sized enterprises (KMU)
- Qualification and experience of relevant personnel required
- Availability of substitute personnel
What to submit
- Names and professional qualifications of personnel to be deployed
- Electronic submission required
Award criteria
- Education and qualification of relevant personnel (25% weighting)
- Availability of substitute personnel (15% weighting)
- Overall price (60% weighting)
Source
Published on Austrian Public Procurement Search. Original title: Rahmenvereinbarung über die Durchführung von BWI-Arbeiten und Planungsarbeiten im Gas- und Wärmenetz.
Summary and assessment prepared by Pelenoir from the public notice (12 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.