About the project

Study and execution supervision for the construction of new underground technical rooms and related adaptation works in 26 metro stations on lines 2 and 6. The project includes stability studies, feasibility assessments, topographic surveys, and implementation control for new technical facilities (e.g., signaling, door control).

Scope of work

Full assignment for the study and monitoring of execution works for the renewal of signage on metro lines 2 and 6. Includes the creation of new technical rooms, stability studies, feasibility assessments, topographic surveys, and implementation control in 26 stations. Requires plans, calculations, measurements, and potential 3D scans as instructed by the study office or supervising officer.

Deliverables

  • plans for technical rooms
  • stability study with calculations
  • bill of quantities (métrés)
  • feasibility study for equipment integration
  • topographic surveys of existing and new technical rooms
  • implementation control reports (before, during, and after execution)

Required services

  • stability studies
  • feasibility studies
  • topographic surveying
  • implementation control and monitoring
  • 3D scanning (if required)

Pelenoir assessment

This project primarily involves engineering and technical planning for the renewal of underground metro infrastructure, including stability and feasibility studies for new technical rooms. Secondary disciplines include topographic surveying to support planning and construction supervision to ensure execution compliance.

  • Structural and stability studies, feasibility assessments, and technical planning for the construction of new underground technical rooms and related infrastructure adaptations in 26 metro stations.

  • Surveying 20%

    Topographic surveys of existing and new technical rooms, including measurements and potential 3D scanning to support the planning and execution of infrastructure works.

  • Supervision and implementation control of execution works, including monitoring before, during, and after construction to ensure compliance with plans and specifications.

How to take part

Who can apply

  • compliance with Belgian public procurement law (Art. 25 of Royal Decree of 14 January 2013)
  • financial guarantee of 5% of the total offer amount (excl. VAT)

What to submit

  • tender documents as specified in the contract
  • electronic signature required for submission

Tender documents

No documents are visibly available for this tender. Based on the tender description, the document package would likely include: (1) detailed technical specifications and requirements for the study and execution of new technical rooms, (2) contractual terms and conditions, including the 5% financial guarantee requirement, and (3) submission forms for tenderers. However, the absence of visible files means the exact content, such as specific plans, stability study templates, or topographic survey guidelines, cannot be confirmed. No drawings, models, or additional supporting documents are observable from the supplied context.

Source

Published on Belgian e-Procurement. Original title: Voorbereiding vernieuwing van de signalisatie van metrolijnen 2 en 6 – Volledige opdracht met betrekking tot de studie en opvolgen van de uitvoeringswerkzaamheden van de ruwbouw en afwerkingen voor de realisatie van ondergrondse netwerkinfrastructuur, met als doel nieuwe technische lokalen te bouwen voor de plaatsing van nieuwe uitrustingen mogelijk te maken..

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.