About the project

Design documentation and author supervision for the construction of a new bridge on provincial road 886 at km 17+457 over Niebocki Potok, including roadway expansion, demolition, construction and reconstruction of technical infrastructure and structures in Grabownica Starzeńska.

Scope of work

Preparation of design documentation (including construction and execution designs), obtaining a decision on permission for road investment implementation with immediate enforceability, and providing author supervision for the bridge construction on provincial road 886 over Niebocki Potok, including roadway expansion, demolition, construction and reconstruction of technical infrastructure and structures.

Deliverables

  • design documentation (construction and execution designs)
  • decision on permission for road investment implementation (ZRID) with immediate enforceability
  • author supervision during construction

Required services

  • preparation of project and cost estimation
  • engineering design services
  • preparation of approval plans, working drawings and specifications
  • geotechnical engineering services
  • mapping services
  • environmental impact assessment for construction projects
  • project and documentation supervision
  • feasibility studies, advisory services, and analyses

Pelenoir assessment

This project primarily involves engineering and technical planning for the design and construction of a new bridge and roadway expansion on provincial road 886. Secondary aspects include project and construction management (author supervision) and specialist consulting for feasibility studies and regulatory approvals.

  • Structural and civil engineering design for the new bridge on provincial road 886, including roadway expansion, technical infrastructure, and reconstruction of associated structures. This includes preparation of construction and execution designs, geotechnical engineering, and mapping services.

  • Author supervision during the construction phase to ensure compliance with the design documentation and project specifications. This includes oversight of the bridge construction and associated infrastructure works.

  • Preparation of feasibility studies, advisory services, and environmental impact assessments for the bridge and road expansion project. This includes obtaining the decision on permission for road investment implementation (ZRID) with immediate enforceability.

How to take part

Who can apply

  • experience in designing public roads of class G or higher with construction of a permanent road bridge (class A or I) and obtaining ZRID decision
  • qualified personnel: road designer (unlimited road design license), road checker, bridge designer (unlimited bridge design license), bridge checker
  • submission of executed services list and personnel qualifications with experience periods

What to submit

  • offer with attachments (declarations on exclusion grounds, compliance with participation conditions, consortium statements if applicable)
  • list of executed services with references
  • list of personnel with qualifications, experience, and function periods
  • Table of Design Studies (Tabela Opracowań Projektowych)
  • documents confirming signing authority (power of attorney if applicable)

Award criteria

  • Price (50%)
  • Experience of the designer – road sector (20%)
  • Experience of the designer – bridge sector (20%)
  • Experience of the team (10%)

Tender documents

The visible ZIP file named 'SWZ_WDT_4_2026.zip' likely contains the full Specyfikacja Warunków Zamówienia (SWZ), which typically includes the detailed terms of reference, technical requirements, contract conditions, and submission templates for this procurement. Based on the tender context, it probably also contains standard forms, declaration templates, and possibly preliminary design or survey data for the bridge and road expansion project. The exact contents of the drawings, calculations, or environmental assessments cannot be confirmed without accessing the file, but the SWZ is expected to outline all required design documentation and approval processes.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej oraz pełnienie nadzoru autorskiego dla zadania pn.: „Rozbudowa DW 886 … polegająca na budowie mostu w km 17+457 na cieku Niebocki Potok w m. Grabownica Starzeńska”.

Summary and assessment prepared by Pelenoir from the public notice (13 Oct 2026). The original notice and its documents are binding. Page updated 12 Oct 2026.