About the project

Design and planning services for the replacement of rail switches at multiple locations in Western Finland, including field measurements, soil and laboratory investigations, and environmental technical expert services.

Scope of work

Design and planning for rail switch replacements at multiple rail locations in Western Finland, including field measurements, soil and laboratory investigations, and environmental technical expert services. The contract includes an option for construction-phase design services.

Deliverables

  • Construction design for rail switch replacements
  • Field measurements and surveys
  • Soil and laboratory investigations
  • Environmental technical expert services

Required services

  • rail infrastructure design
  • geotechnical investigations
  • environmental technical consulting

Pelenoir assessment

This project is primarily focused on engineering and technical planning for rail switch replacements, supported by surveying and geomatics for field measurements and specialist consulting for geotechnical and environmental assessments. The scope is centered on transportation infrastructure design and associated technical services.

  • Design and planning for rail switch replacements, including structural, civil, and technical engineering aspects of rail infrastructure. This includes ensuring compliance with technical standards and integration with existing rail systems.

  • Surveying 20%

    Field measurements and surveys required for rail switch replacements, including geodetic and topographic data collection to support design and construction activities.

  • Soil and laboratory investigations, as well as environmental technical expert services, including geotechnical assessments and environmental impact evaluations for rail infrastructure projects.

How to take part

Who can apply

  • Submission of signed project-specific confidentiality commitment and personal confidentiality commitments for individuals handling confidential information
  • Compliance with selection criteria specified in procurement documents (ESPD and procurement documents)

What to submit

  • Participation request (osallistumishakemus)
  • Signed project-specific confidentiality commitment
  • Signed personal confidentiality commitments for individuals handling confidential information

Award criteria

  • Lowest comparative price with 100% weight